Laserfiche WebLink
all dispute responsibilities as listed in existing interconnection contracts. Disputes are resolved in <br />accordance with Part T. <br />Subp. 3. Renewable energy credits; ownership. Generators own all renewable energy credits unless <br />other ownership is expressly provided for by a contract between a generator and the utility. <br /> <br />Part V. UNIFORM CONTRACT <br />The form for uniform contract that shall be used between the utility and a qualifying facility <br />having less than 40 kilowatts of capacity is as shown in subpart 1. <br />Subpart 1. Uniform Contract for Cogeneration and Small Power Production Facilities. (See attached <br />contract form.) <br />8 <br />84 <br />