My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
all dispute responsibilities as listed in existing interconnection contracts. Disputes are resolved in <br />accordance with Part T. <br />Subp. 3. Renewable energy credits; ownership. Generators own all renewable energy credits unless <br />other ownership is expressly provided for by a contract between a generator and the utility. <br /> <br />Part V. UNIFORM CONTRACT <br />The form for uniform contract that shall be used between the utility and a qualifying facility <br />having less than 40 kilowatts of capacity is as shown in subpart 1. <br />Subpart 1. Uniform Contract for Cogeneration and Small Power Production Facilities. (See attached <br />contract form.) <br />8 <br />84 <br />
The URL can be used to link to this page
Your browser does not support the video tag.