Laserfiche WebLink
the WHP area, DWSMA, and the vulnerability assessments and the meetings of the WHP <br />protection team were open to the public. Also, a public hearing was held before the completed <br />WHP plan was sent to MDH for state agency review and approval. The following issues were <br />identified during comment periods <br />Table 5Issues, Problems and Opportunities <br />Problem Associated Adequacy of <br />Impacted Opportunity Associated <br />Issue Identified with the Identified Existing Controls to <br />Featurewith the Identified Issue <br />IssueAddress the Issue <br />The ERMUcan partner with <br />The ERMUdoes not <br />There are likely AquiferThe ERMUneeds to Sherburne County & SWCD to <br />have authority to require <br />numerous unused Well Water assess which wells help property owners pay for <br />that unused wells be <br />and unsealed wells Qualitypresent a threat to the the costs of properly sealing <br />properly sealed. <br />on residential DWSMA aquifer based upon their unused wells. <br />& commercial (Select all depth, construction, and The MDH has grant programs <br />The MDH has authority <br />propertiesthat apply.) state of repairavailable to assist with the <br />to require well sealing <br />sealing of wells <br />No jurisdiction for a ERMUwill work closely with County presently has <br />Aquifer <br />DWSMA small number of the numerous jurisdictions on zoning and building <br />DWSMA <br />boundaries extend properties located within land use decisions outside permit jurisdiction over <br />Well Water <br />past ERMUlimitsand outside the ERMU.the DWSMA located <br />Quality <br />DWSMA.outside ERMUlimits. <br />At the present timethe <br />ERMU, local and state <br />governments have <br />existing controls in place <br />The ERMU <br />to address most issues as <br />recognizes this is a <br />they occur. Some issues <br />10 year plan and The ERMUhas the <br />are uncontrollable and <br />that issues, AquiferThe ERMUneeds to opportunity to work with other <br />unforeseen and <br />problems, and DWSMAhave the flexibility to local units of government to <br />additional controls might <br />opportunities can Well Water address changing address those issues, problems <br />need to be considered to <br />change from today Qualitysituationsand opportunities that may <br />address new issues. The <br />which can impact change over the next 10 years. <br />ERMU, local and state <br />the implementation <br />governments are <br />strategies <br />continually updating land <br />use controls as new <br />issues, new problems and <br />new opportunities occur. <br />The ERMUhas <br />With limited resources ERMUwill form working ERMUhas limited time <br />limited resources to <br />theimplementation of partnerships with local units of and resources for <br />implement all of the <br />the WHP Plan will be a government and state agencies implementation. <br />management DWSMA <br />challenge to the ERMU.that have regulatory authority <br />strategies contained <br />and/or programs to help with <br />within this WHP <br />implementation. <br />plan <br />New high capacityAquiferThe ERMUhas no The ERMUwill keep updating The ERMUwill need to <br />wells drilled within DWSMAauthority over the land use controls to allow the work closely with MDH <br />the DWSMA or one Well Water construction and ERMUthe authority over the and the MN Dept of <br />mile of the Qualitypumping rates for newly construction of high capacity Natural Resources of <br />8 <br />402 <br />