My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Notify MDH if a Class V well is identified and provide management <br />materials to the Class V well owner <br />As Occurs <br />Meet with Sherburne County SWCD to discuss areas where they can work <br />cooperatively on water and land use management issues with the DWSMA <br />and on grant funding. <br />Annually <br />Work with all entities involved in the DWSMA on land use issues. <br />As Needed <br />Meet with Elk River Planning and Zoning to incorporate the map in the city <br />land use and incorporate the WHP Plan into the city Comprehensive Plan <br />x <br />Have Well #5 sampled for stable isotopes of oxygen (180) and deuterium <br />(2H) and several general chemistry parameters on water produced to assess <br />the degree to which surface waters may be contributing to the well. Have <br />x <br />MDH staff and MDH hydro geologist assist in the collection and evaluation <br />of the sampling of surface waters up-gradient of Well #5 as needed. Apply <br />for a SWP grant to help pay associated costs. Contact MDH as to availability <br />of grant Programs <br />Evaluate reasons for younger water being produced at Well #5. Evaluate the <br />downward groundwater leakage from shallower aquifers and overlying <br />x <br />surface bodies into the Mount Simon-Hinckley aquifer. <br />Implement measures that are specified in the IWMZ PCSI report <br />Annually <br />Monitor and maintain the 200 ft. radius around the wells to ensure that <br />setback distances for new potential contamination sources are met. <br />Annually <br />Assist MDH staff in updating the IWMZ inventory for the public water <br />supply wells. Contact your MDH Planner if changes to the locations or <br />x <br />construction of potential contaminant sources are proposed in the IWMZ. <br />Develop policies and procedures for an Emergency Water Plan dealing with <br />derailment as to the proximity of the Railroad and Hwy #10 to Wells # 1 and <br />x <br />Well #2 <br />ix <br />392 <br />
The URL can be used to link to this page
Your browser does not support the video tag.