My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
qualifying facility. In either case, the utility (and, as applicable, the utility's wholesale <br />supplier) and the owner of the qualifying facility will cooperate in the transition from the <br />form of contract set forth in the utilityRules Governing Interconnection of Cogeneration <br />and Small Power Production to a new form of contract appropriate to a qualifying facility <br />with a capacity of 40 kW or greater. <br />18.Fully executed interconnection contracts for distributed energy resources may be <br />canceled in the event the distributed energy resource fails to interconnect to the utility <br />distribution system within twelve (12) months of signing of the interconnection contract <br />by the qualifying facility and the utility. <br />4 <br />75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.