Laserfiche WebLink
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />(2) Phase voltage representative of the Area service to the facility. <br />(3) Status (open/close) of Distributed Generation and interconnection breaker(s) or if transfer switch <br />is used, status of transfer switch(s). <br />(4) Customer load from Area EPS service (kW and kVAR). <br />(5) Control of interconnection breaker - if required by the Area EPS operator. <br />When telemetry is required, the Interconnection Customer must provide the communications <br />ated phone circuit or <br />other form of communication. If a telephone circuit is used, the Interconnection Customer <br />must also provide the telephone circuit protection. The Interconnection Customer shall <br />coordinate the RTU (remote terminal unit) addition with the Area EPS. The Area EPS may <br />require a specific RTU and/or protocol to match their SCADA or remote monitoring system. <br />344 <br />