My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />(2) Phase voltage representative of the Area service to the facility. <br />(3) Status (open/close) of Distributed Generation and interconnection breaker(s) or if transfer switch <br />is used, status of transfer switch(s). <br />(4) Customer load from Area EPS service (kW and kVAR). <br />(5) Control of interconnection breaker - if required by the Area EPS operator. <br />When telemetry is required, the Interconnection Customer must provide the communications <br />ated phone circuit or <br />other form of communication. If a telephone circuit is used, the Interconnection Customer <br />must also provide the telephone circuit protection. The Interconnection Customer shall <br />coordinate the RTU (remote terminal unit) addition with the Area EPS. The Area EPS may <br />require a specific RTU and/or protocol to match their SCADA or remote monitoring system. <br />344 <br />
The URL can be used to link to this page
Your browser does not support the video tag.