My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />STATE OFMINNESOTA <br />DISTRIBUTED GENERATION INTERCONNECTION <br />REQUIREMENTS <br />TABLE OF CONTENTS <br />Foreword 2 <br />1.Introduction 3 <br />2.References 6 <br />3.Types of Interconnections 7 <br />4.Interconnection Issues and Technical Requirements 10 <br />5.Generation Metering, Monitoring and Control 13 <br />Table 5A Metering, Monitoring and Control Requirements 14 <br />6.Protective Devices and Systems 17 <br />Table 6A Relay Requirements 19 <br />7.Agreements 20 <br />8.Testing Requirements 21 <br />Attachments: System Diagrams <br />Figure 1 Open Transition 25 <br />Figure 2 Closed Transition 26 <br />Figure 3 Soft Loading Transfer <br />With Limited Parallel Operation 27 <br />Figure 4 Soft Loading Transfer <br />With Limited Parallel Operation 28 <br />Figure 5 Extended Parallel <br />With Transfer-Trip 29 <br />329 <br />
The URL can be used to link to this page
Your browser does not support the video tag.