Laserfiche WebLink
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />Attachment V: Additional Operating and Maintenance Requirements <br />Affected Systems <br /> <br /> <br />The Area EPS Operator shall also provide requirements that must be met by the <br />Interconnection <br />Distribution System. Additional operating and maintenance requirements for an Affected <br />System need <br />separate agreement described in Section 14.6. <br />Municipal Minnesota Interconnection Agreement _ January 2019 35 <br /> <br />322 <br />