My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> <br />Attachment A <br /> <br />Assumptions Used in Conducting the Transmission System Impact Study <br />The Transmission System Impact Study shall be based upon the following assumptions: <br />1) Designation of Point of Common Coupling and configuration to be studied. <br />2) Designation of alternative Points of DER Interconnection and configuration. <br />1) and 2) are to be completed by the Interconnection Customer. Other assumptions (listed <br />below) are to be provided by the Interconnection Customer, the Area EPS Operator and the <br />Transmission Provider. The Area EPS Operator and Transmission Provider shall use the <br />Reference Point for Applicability which is either the Point of Common Coupling or the Point(s) <br />of DER Interconnection as described in IEEE 1547. <br /> <br />Additional DER Technical Data Required for Transmission System Impact Study <br />If applicable, the Transmission Provider shall attach a list to this Agreement any additional <br />technical data that is required to adequately perform the Transmission System Impact Study. As <br />indicated in Section 4 of the Study Process document of the M-MIP, this information is to be <br />returned with the signed Transmission System Impact Study Agreement and deposit. <br /> <br /> <br />Data to Be Provided by the Area EPS Operator and Transmission Provider with the <br />Transmission System Impact Study Agreement <br />Estimate Cost of Transmission System Impact Study $ <br />Time duration to complete Transmission System Impact Study Business Days <br /> <br />M-MIP Transmission System Impact Study Agreement - February 2019 8 <br /> <br />278 <br />
The URL can be used to link to this page
Your browser does not support the video tag.