Laserfiche WebLink
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> <br />afforded an opportunity to review and comment upon a System Impact Study that <br />indicates potential adverse system impacts on their electric systems. <br /> <br />7.If the Area EPS Operator uses a queuing procedure for sorting or prioritizing projects <br />and their associated cost responsibilities for any required Network Upgrades, the <br />System Impact Study shall consider all Distributed Energy Resources (and with respect <br />to Section 7.3 below, any identified Upgrades associated with such higher queued <br />interconnection) that, on the date the System Impact Study is commenced. <br /> <br />7.1.Electric System; or <br /> <br />7.2.Are interconnected with Affected Systems and may have an impact on the <br />proposed interconnection; and <br /> <br />7.3.Have a pending higher queued Interconnection Application to interconnect with <br />Electric System. <br /> <br />8.A deposit of the equivalent of the good faith estimated cost of a System Impact Study <br />shall be required from the Interconnection Customer when the signed Agreement is <br />provided to the Area EPS Operator. <br /> <br />9.include a <br />summary of professional time. An invoice shall be sent to the Interconnection Customer <br />within twenty (20) Business Days after the study is completed and delivered. <br /> <br />10.The Interconnection Customer must pay any study costs that exceed the deposit <br />without interest, within twenty (20) Business Days, on receipt of the invoice or <br />resolution of any dispute. If the deposit exceeds the invoiced fees, the Area EPS <br />M-MIP System Impact Study Agreement _ January 2019 3 <br /> <br />255 <br />