My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> <br />System Impact Study Agreement <br /> <br />THIS AGREEMENT is made and entered into this _____day of______________ 20___ by and <br />between_____________________________________________________, <br />municipal utility <br />existing under <br /> <br />RECITALS <br />WHEREAS, the Interconnection Customer is proposing to develop a Distributed Energy <br />Resource (DER) or generating capacity addition to an existing DER consistent with the <br />Interconnection Application completed by the Interconnection Customer <br />on________________________(date); and <br /> <br />WHEREAS, the Interconnection Customer desires to interconnect the DER with the Area EPS <br />Electric System; S <br /> <br />WHEREAS, the Interconnection Customer has requested the Area EPS Operator to perform a <br />System Impact Study to assess the impact of interconnecting the DER with the Area EPS <br />Electric System, and potential Affected System(s); <br /> <br />NOW, THEREFORE, in consideration of, and subject to, the mutual covenants contained herein <br />the Parties agreed as follows: <br /> <br />1.When used in this Agreement, with initial capitalization, the terms specified shall have <br />the meanings indicated, or the meanings specified, in the Municipal Minnesota <br />Distributed Energy Resources Interconnection Process (M-MIP). <br /> <br />2.The Interconnection Customer elects and the Area EPS Operator shall cause to be <br />performed a System Impact Study consistent with the M-MIP. The scope of a System <br />M-MIP System Impact Study Agreement _ January 2019 1 <br /> <br />253 <br />
The URL can be used to link to this page
Your browser does not support the video tag.