Laserfiche WebLink
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />Interconnection Facilities Information <br />Will a transformer be used between the DER and the Point of <br /> Yes No <br />Common Coupling? <br />Will the transformer be provided by the Interconnection Customer? <br /> Yes No <br />If yes, please fill in the fields below. <br />Proposed location of protective interface equipment on property: <br />Transformer Data (For Interconnection Customer-Owned Transformer) <br />What is the phase configuration of the transformer? Single Phase Three Phase <br />Size (kVA): Transformer Impedance (%): On kVA Base: <br />Transformer Volts: Delta: Wye: Wye Grounded: <br />(Primary) <br />Transformer Volts: Delta: Wye: Wye Grounded: <br />(Secondary) <br />Transformer Volts: Delta: Wye: Wye Grounded: <br />(Tertiary) <br />Transformer Fuse Data (For Interconnection Customer-Owned Fuse) <br />Manufacturer: Type: Size: Speed: <br />Interconnecting Circuit Breaker (For Interconnection Customer-Owned Circuit Breaker) <br />Manufacturer: Type: <br />Load Rating (in Amps): Interrupting Rating (In Amps): Trip Speed (Cycles): <br />Interconnection Protective Relays (For Microprocessor Controlled Relays) <br />Setpoint Function Minimum Maximum <br /> <br /> <br /> <br /> <br /> <br /> <br />ELK RIVER MUNICIPAL UTILITIES 7 <br /> <br />244 <br />