My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />Interconnection Agreement <br />Proposed DER interconnections that are also deemed Qualifying Facilities under Minnesota Statutes <br />§Uniform Contract for Cogeneration and Small Power <br />Production Facilities. Included in this agreement are payment terms for excess power generated by <br />the proposed DER system the Utility may purchase <br />Cogeneration and Small Power Production Facilities, the Interconnection Customer may choose to <br />instead sign the Municipal Minnesota Interconnection Agreement (MMIA). <br />The Interconnection Customer requests an MMIA to be executed in lieu of the <br /> Yes No <br />Facilities. <br />Disclaimers Must be completed by Interconnection Customer <br />Initials <br />The Interconnection Customer has opportunities to request a timeline extension <br />during the interconnection process. Failure by the Interconnection Customer to <br />meet or request an extension for a timeline outlined in the Interconnection Process <br />could result in a withdrawn queue position and the need to re-apply. <br />Simplified Process may be moved into the Fast Track Process if engineering screens <br />are failed during the Simplified Application review. <br />Application Signature Must be completed by Interconnection Customer <br /> <br />I designate the individual or company listed as my Application Agent to serve as my <br />agent for the purpose of coordinating with the Area EPS Operators on my behalf <br />__________ <br />throughout the interconnection process. <br />Initials <br /> <br />I hereby certify that, to the best of my knowledge, the information provided in this Application is true, <br />and that I have appropriate Site Control in conformance with the Interconnection Process. I agree to <br />abide by the Municipal Minnesota Distributed Energy Resource Interconnection Process (M-MIP) and <br />return the Certificate of Completion when the DER has been installed. <br />___________________________________________ ________________________ <br />Applicant Signature: Date: <br />***Please print clearly or type and return completed along with any additional documentation*** <br /> <br />ELK RIVER MUNICIPAL UTILITIES <br />236 <br />
The URL can be used to link to this page
Your browser does not support the video tag.