Laserfiche WebLink
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />4.4.1.Interconnection Customer Timelines <br />In order to remain in consideration for interconnection, an Interconnection <br />Customer who has requested a System Impact Study shall meet the following <br />conditions within twenty (20) Business Days of being provided a System Impact <br />Study Agreement: <br /> <br />Return a signed System Impact Study Agreement. <br /> <br />Provide to the Area EPS Operator any requested additional and reasonable <br />technical data on the DER needed to perform the System Impact Study. <br /> <br />Pay the required study deposit. <br /> <br />a time frame extension as described in Section 9.29.2, if additional technical data <br />is requested. <br /> <br />4.4.2Area EPS Operator Timelines <br />A System Impact Study shall be completed within thirty (30) Business Days after <br />the System Impact Study Agreement has been signed by both Parties and <br />delivered with the deposit and requested technical information to the Area EPS <br />Operator. The results of the System Impact Study shall be delivered to the <br />Interconnection Customer within five (5) Business Days of completion of the <br />System Impact Study. Upon request, the Area EPS Operator shall provide the <br />Interconnection Customer supporting documentation developed in the <br />preparation of the System Impact Study, subjected to confidentiality <br />arrangements consistent with Section 12.1 of the Overview Process and terms of <br />the System Impact Study Agreement. <br /> <br />5Transmission System Impact Study <br />5.1.Transmission System Impacts <br />In instances where the System Impact Study shows potential for Transmission System <br />adverse system impacts, the Area EPS Operator shall contact the appropriate <br />Transmission Provider within five (5) Business Days following the identification of such <br />impacts. The Area EPS Operator shall coordinate with <br />Transmission Provider to have the necessary studies to determine if the DER causes any <br />adverse transmission impacts. The appropriate Transmission Provider shall provide a <br />Transmission System Impact Study Agreement for the Interconnection Customer. <br />Included in the Transmission System Impact Study Agreement will be a non-binding, <br />5 <br /> <br />216 <br />