My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />3Initial Steps <br />3.1.Completeness Review and Queue Position <br />The Interconnection Application originally submitted under the Study Process shall be <br />date- and time-stamped upon initial receipt, and if necessary, resubmission receipt. The <br />Interconnection Customer shall be notified of receipt by the Area EPS Operator within <br />ten (10) Business Days after receipt. <br /> <br />The Area EPS Operator shall notify the Interconnection Customer, within ten (10) <br />Business Days, if the Interconnection Application is deemed incomplete, and provide a <br />written list detailing all information that must be provided to complete the <br />Interconnection Application. The Interconnection Customer has ten (10) Business Days, <br />to provide the missing information, unless additional time is requested with a valid <br />reason. Failure to submit the requested information, within the stated timeline, will <br />result in the Interconnection Application being deemed withdrawn. The Area EPS <br />Operator has an additional five (5) Business Days to review the additionally provided <br />information for completeness. <br /> <br />An Interconnection Application will be deemed complete upon submission to the Area <br />EPS Operator, provided all documents, fees and information required with the <br />Interconnection Application, adhering to Minnesota Technical Requirements, is <br />included. The date- and time-stamp of the completed Interconnection Application shall <br />be accepted as the qualifying date for the purpose of establishing a queue position, as <br />described in Section 4.7 of the Overview Process document. <br /> <br />Interconnection Applications already screened in the Simplified Process or Fast Track <br />Process shall retain their original queue position in the Study Process provided all <br />applicable timelines were met. <br /> <br />3.2.Scoping Meeting <br />A scoping meeting shall be held within ten (10) Business Days after the Interconnection <br />Application submitted under the Study Process is deemed complete. For <br />Interconnection Applications that were submitted under or put through the Fast Track <br />Process, the scoping meeting will occur within ten (10) Business Days after the <br />Interconnection Customer has elected to continue with the Study Process. The scoping <br />meeting timeline may be extended upon mutual agreement of both Parties. The scoping <br />meeting may also be omitted by mutual agreement. <br /> <br />The purpose of the scoping meeting is to discuss the Interconnection Application and <br />review existing study results relevant to the Interconnection Application. The Parties <br />shall further discuss whether the Area EPS Operator should perform a System Impact <br />3 <br /> <br />214 <br />