My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />1Applicability <br />1.1.Applicability <br />The Study Process is applicable to an Interconnection Customer proposing to <br />interconnect a Distributed Energy Resource (DER) with the Area Electrical Power System <br />(Area EPS) , if the DER capacity is larger than 4 MW or is <br />identified through the engineering screening process to need additional studies. <br /> <br />The majority of proposed DER interconnections will initially apply for interconnection <br />under the Simplified or Fast Track Processes. Initial and supplemental screening results <br />are to be considered throughout the Study Process. <br /> <br />1.2.Codes, Standards and Certification Requirements <br />The Interconnection Customer proposed DER must meet the codes, standards and <br />certification requirements listed in Section 13, 14 and Section 15 of the Process <br />Overview document. The Area EPS Operator may allow DER systems that do not meet <br />codes, standards and certification only if the DER system design is reviewed, tested and <br />determined to be safe to operate in parallel with the Distribution System. <br /> <br />2Application Submission <br />2.1.Initial Interconnection Application for the Study Process <br />For proposed DER interconnections that are not initially applied for under the Fast Track <br />Process, the Interconnection Customer shall complete the Standard Interconnection <br />Application and submit it to the Area EPS Operator to initiate the Interconnection <br />Process. A completed Interconnection Application will include the following: <br /> <br />A completed Interconnection Application signed by the Interconnection Customer. <br /> <br />A process fee not to exceed $1,000, plus $2.00 per kW, toward the deposit of the <br />study(s) indicated in Section 4. <br /> <br />A site layout drawing of the proposed DER system. <br /> <br />A one-line diagram of the proposed DER system showing the Point of Common <br />CDistribution System. <br /> <br />All equipment manufacturer specification sheets. <br /> <br />Documentation of site control as indicated in Section 2.4. <br /> <br />1 <br /> <br />212 <br />
The URL can be used to link to this page
Your browser does not support the video tag.