My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />The Party will suffer significant uncompensated economic or operational harm <br />from the delay, or <br /> <br />Attainment of the same milestone has previously been delayed, or <br /> <br />The Party has reason to believe the delay in meeting the milestone is <br />intentional or unwarranted notwithstanding the circumstance explained by the <br />Party proposing the amendment. <br /> <br />If the Party affected by the failure to meet a milestone disputes the proposed <br />extension, the affected Party may pursue dispute resolution as described in the <br />Overview Process document. <br /> <br />9.2.Metering <br />Any metering requirements necessitated by the use of the DER system shall be installed <br />ng requirement costs will be <br />included in the final invoice of interconnection costs to the Interconnection Customer. <br />The Interconnection Customer is also responsible for metering replacement costs not <br />mer charge. The Area EPS <br />Operator may charge Interconnection Customers an ongoing metering-related charge <br />for an estimate of ongoing metering-related costs specifically demonstrated. <br /> <br />9.3.Construction <br />The Interconnection Customer may proceed to construct (including operational testing <br />not to exceed two hours) the DER system when the Area EPS Operator has approved <br />the Interconnection Application. Upon receipt of a signed Uniform Contract or <br />Interconnection Agreement the Area EPS Operator shall schedule and execute <br />appropriate construction of facilities. <br /> <br />9.4.Inspection, Testing and Commissioning <br />Upon completing construction of the DER system, the Interconnection Customer will <br />cause the DER system to be inspected or otherwise certified by the appropriate local <br />electrical wiring inspector with jurisdiction. The Interconnection Customer shall then <br />Interconnection Facilities prior to interconnection pursuant to Minnesota <br />Interconnection Technical Requirements. Commissioning tests of the Interconnection <br /> and Section 15 in the Overview <br />Process. <br /> <br />15 <br /> <br />204 <br />