My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />6Insurance <br />6.1.Insurance Requirements <br />At minimum, the Interconnection Customer shall maintain, for the duration the DER <br />Distribution System, general <br />liability ins <br />with a combined single limit of not less than those described in Table 6.1. Such general <br />liability insurance shall include coverage against claims for damages resulting from (i) <br />bodily injury, including wrongful death; and (ii) property damage arising out of the <br />under this <br />agreement. Evidence of the insurance shall state that coverage provided is primary and <br />is not excess to or contributing with any insurance or self-insurance by the Area EPS <br />Operator. <br />Table 6.1.Liability Insurance Requirements <br />DER System Size Liability Insurance Requirement <br />< 40 kW AC $300,000 <br /> $1,000,000 <br /> $2,000,000 <br /> $3,000,000 <br /> <br />For all proposed DER systems, except those that are qualifying systems less than 40 kW <br />AC, the general liability insurance shall, by endorsement to the policy or polices: <br /> <br />Include the Area EPS Operator as additionally insured. <br /> <br />Contain severability of interest clause or cross-liability clause. <br /> <br />Provide that the Area EPS Operator shall not by reason incur liability to the <br />insurance carrier for the payment of premiums for such insurance if the Area <br />EPS Operator is included as an additionally insured. <br /> <br />6.2.Self-Insurance <br />The Interconnection Customer may choose to be self-insured provided there is an <br />established record of self-insurance. The Interconnection Customer shall supply the <br />Area EPS Operator at least 20 days prior to the date of initial operation, evidence of an <br />acceptable plan to self-insure to a level of coverage equivalent to that required in <br />Section 6.1. Failure of the Interconnection Customer or the Area EPS Operator to <br />enforce the minimum levels of insurance does not relieve the Interconnection <br />Customer from maintaining such levels of insurance or relieve the Interconnection <br />Customer of any liability. <br /> <br />12 <br /> <br />201 <br />
The URL can be used to link to this page
Your browser does not support the video tag.