Laserfiche WebLink
4.Design Standards. <br />Communication Equipment shall at all times be in conformity with the National Electric Safety <br />Code, as amended and all applicable Federal, State, and Local regulations and requirements. All <br />prepared by a qualified and certified engineer and submitted to Owner for review and approval <br />ƦƩźƚƩ to the commencement of any work. <br />5.Right of Way for Lic Owner does not, in any manner, warrant or covenant <br />with the Licensee regarding the validity of any easements, franchise or other authorizations <br />warrant or covenant with Licensee regarding the validity of any rights hereby given with respect <br /> <br />6.Division of Costs. <br />a.The cost of erecting new poles covered by this Agreement, to construct new pole lines, <br />to make extensions to existing pole lines or to replace existing poles, shall be borne by <br />the parties as follows: <br />i.The cost in place of a normal pole or pole smaller than normal shall be borne by <br />Owner. Owner shall have sole discretion to determine, from time to time, the <br />specifications for a normal pole. <br />ii.In the case of a pole larger than normal, where all or part of the extra height or <br />strength is necessary because of the requirements of Licensee, including <br />requirements for k <br />to meet required clearances, the extra cost in place of such a pole shall be borne <br />by Licensee. <br />iii.In the case of a pole larger than normal where all or part of the extra height or <br />strength is necessary because of requirements of Owner, including <br />of trees or to meet required clearances, the extra cost in place of such a pole <br />er. <br />iv.In the case of a pole larger than normal where all or part of the extra height or <br />strength is necessary because of the requirements of both parties, or the <br />requirements of public authorities or property owners (other than requirements <br />with regard to keeping the equipment of one party only clear of trees or to keep <br />the required clearance for that one party), Licensee shall pay the Owner a sum <br />equal to one-half the difference between the cost in place of such pole and the <br /> <br />Page 2 of 5 <br /> <br />59 <br />