My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />ultimately connects to. The Interconnection Customer must request additional Pre- <br />Application Reports if information about multiple PCCs is requested. <br /> <br />The Pre-Application Report will only include existing data. A request for a Pre- <br />Application Report does not obligate the Area EPS Operator to conduct a study or other <br />analysis of the proposed DER in the event that data is not readily available. The Area <br />EPS Operator will provide the Interconnection Customer with the data that is available. <br />The confidentiality provisions in Section 12.1 apply to Pre-Application Reports. <br /> <br />5.3.Pre-Application Report Components <br />The Pre-Application Report shall include the following pieces of information provided <br />the data currently exists and is readily available. <br /> <br />Total capacity (in megawatts (MW)) of substation/area bus, bank or circuit based <br />on normal or operating ratings likely to serve the proposed Point of Common <br />Coupling. <br /> <br />Existing aggregate generation capacity (in MW) interconnected to a <br />substation/area bus, bank or circuit (i.e., amount of generation online) likely to <br />serve the proposed Point of Common Coupling. <br /> <br />Aggregate queued generation capacity (in MW) for a substation/area bus, bank or <br />circuit (i.e., amount of generation in the queue) likely to serve the proposed Point <br />of Common Coupling. <br /> <br />Available capacity (in MW) of substation/area bus or bank and circuit likely to <br />serve the proposed Point of Common Coupling (i.e., total capacity less the sum of <br />existing aggregate generation capacity and aggregate queued generation <br />capacity). <br /> <br />Substation nominal distribution voltage and/or transmission nominal voltage if <br />applicable. <br /> <br />Nominal distribution circuit voltage at the proposed Point of Common Coupling. <br /> <br />Approximate circuit distance between the proposed Point of Common Coupling <br />and the substation. <br /> <br />Relevant line section(s) actual or estimated peak load and minimum load data, <br />including daytime minimum load and absolute minimum load, when available. <br /> <br />Whether the Point of Common Coupling is located behind a line voltage regulator. <br />10 <br /> <br />154 <br />
The URL can be used to link to this page
Your browser does not support the video tag.