SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />ultimately connects to. The Interconnection Customer must request additional Pre- <br />Application Reports if information about multiple PCCs is requested. <br /> <br />The Pre-Application Report will only include existing data. A request for a Pre- <br />Application Report does not obligate the Area EPS Operator to conduct a study or other <br />analysis of the proposed DER in the event that data is not readily available. The Area <br />EPS Operator will provide the Interconnection Customer with the data that is available. <br />The confidentiality provisions in Section 12.1 apply to Pre-Application Reports. <br /> <br />5.3.Pre-Application Report Components <br />The Pre-Application Report shall include the following pieces of information provided <br />the data currently exists and is readily available. <br /> <br />Total capacity (in megawatts (MW)) of substation/area bus, bank or circuit based <br />on normal or operating ratings likely to serve the proposed Point of Common <br />Coupling. <br /> <br />Existing aggregate generation capacity (in MW) interconnected to a <br />substation/area bus, bank or circuit (i.e., amount of generation online) likely to <br />serve the proposed Point of Common Coupling. <br /> <br />Aggregate queued generation capacity (in MW) for a substation/area bus, bank or <br />circuit (i.e., amount of generation in the queue) likely to serve the proposed Point <br />of Common Coupling. <br /> <br />Available capacity (in MW) of substation/area bus or bank and circuit likely to <br />serve the proposed Point of Common Coupling (i.e., total capacity less the sum of <br />existing aggregate generation capacity and aggregate queued generation <br />capacity). <br /> <br />Substation nominal distribution voltage and/or transmission nominal voltage if <br />applicable. <br /> <br />Nominal distribution circuit voltage at the proposed Point of Common Coupling. <br /> <br />Approximate circuit distance between the proposed Point of Common Coupling <br />and the substation. <br /> <br />Relevant line section(s) actual or estimated peak load and minimum load data, <br />including daytime minimum load and absolute minimum load, when available. <br /> <br />Whether the Point of Common Coupling is located behind a line voltage regulator. <br />10 <br /> <br />154 <br />