My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />requested with valid reasons. Failure to submit the requested information within the <br />stated timeline will result in the Interconnection Application being withdrawn. <br /> <br />An Interconnection Application will be deemed complete upon submission to the Area <br />EPS Operator when all documents, fees and information required with the <br />Interconnection Application adhering to Minnesota Technical Requirements are <br />included. The time- and date- stamp of the completed Interconnection Application shall <br />be accepted as the qualifying date for purposes of establishing a queue position as <br />described in Section 4.7. <br /> <br />Depending on the process track the Area EPS Operator has either a total of twenty (20) <br />Business Days or twenty-five (25) Business Days to complete the Interconnection <br />Application review and submit notice back to the Interconnection Customer stating the <br />proposed DER system may proceed with the interconnection process or the proposed <br />DER system requires additional engineering studies. The period of time when waiting <br />for the Interconnection Customer to provide missing information is not included in the <br /> Business Days or twenty-five (25) Business Days <br />review timeline. <br /> <br />4.5.Comparability <br />The Area EPS Operator shall receive, process and analyze all Interconnection <br />Applications in a timely manner. The Area EPS Operator shall use the same Reasonable <br />Efforts in processing and analyzing Interconnection Applications from all <br />Interconnection Customers. <br /> <br />4.6.Changing Process Queues <br />During the review of the initially submitted Interconnection Application for the <br />proposed DER system, the Area EPS Operator may determine the proposed DER system <br />should be in a different process track. For proposed DER systems that are moved into a <br />different process track after submittal of the initial application, the difference between <br />the originally submitted processing fee and the current process track processing fee <br />will be assessed. In addition, the Area EPS Operator may request the Interconnection <br />Customer to provide additional information regarding the proposed DER system. <br /> <br />4.7.Queue Position <br />The Area EPS Operator shall maintain a single, administrative queue and may manage <br />the queue by geographical region. The queue position of each completed <br />Interconnection Application is used to determine the engineering review. The queue <br />position is also used to determine the cost responsibility for system upgrades necessary <br />to accommodate the interconnection. <br />8 <br /> <br />152 <br />