My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />3.5.Study Process <br />An application to interconnect a DER that does not meet the Simplified Process or Fast <br />Track Process eligibility requirements or does not pass the review as described in either <br />process, shall be evaluated under the Study Process. <br /> <br />3.6.Process Assistance <br />Prior to submitting an Interconnection Application, the Interconnection Customer may <br /> DER Interconnection Coordinator which process track a <br />proposed interconnection is subject to and about additional details regarding each <br />process track. <br /> <br />An Interconnection Customer can obtain, through an informal request, general <br />information about the Interconnection Process and about potentially Affected <br />System(s) for a proposed interconnection at a specific location. The existing electric <br />system information provided to the Interconnection Customer should include relevant <br />system study results, interconnection studies, and other materials useful to an <br />System. Information will be provided to the extent such provision does not violate the <br />privacy policies of the Area EPS Operator, confidentiality provisions of prior agreements <br />or critical infrastructure requirements. The Area EPS Operator shall comply with <br />reasonable requests for such information. <br /> <br />4Interconnection Application <br />4.1.Overview <br />Each process track has different information that needs to be provided to the Area EPS <br />Operator. Table 4.1 indicates which application is to be completed in its entirety and <br />submitted to the Area EPS Operator to start the interconnection process for the <br />proposed DER system. <br /> <br />Table 4.1.Interconnection Application <br />Process Track Application <br />Simplified Simplified Interconnection Application <br />Fast Track Standard Interconnection Application <br />Study Standard Interconnection Application <br /> <br />The Area EPS Operator will provide all necessary Interconnection Applications, <br />Interconnection Process documents and sample interconnection agreements on its <br />website if possible. The Area EPS Operator will also accept Interconnection Applications <br />6 <br /> <br />150 <br />
The URL can be used to link to this page
Your browser does not support the video tag.