My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-26-2019 PC MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Minutes
>
2010 - 2019
>
2019
>
11-26-2019 PC MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2019 1:34:21 PM
Creation date
12/18/2019 1:34:20 PM
Metadata
Fields
Template:
City Government
type
PCM
date
11/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning Commission Page 2 <br /> November 26,2019 <br /> Mr. Leeseberg presented the staff report. • <br /> Councilmember Ovall asked questions regarding the height of the proposed tower. <br /> Mr.Leeseberg indicated the submitted narrative stated the temporary facility will <br /> include the placement of a 120'tall ballasted monopole. <br /> Chair Johnson opened the public hearing. <br /> Brian Kabat, Buell Consulting,representing the applicant, affirmed the height of <br /> the proposed temporary tower will be a 120' tall ballasted monopole. <br /> There being no one else to speak, Chair Johnson closed the public hearing. <br /> Moved by Commissioner Beise and seconded by Commissioner Thiel to <br /> recommend approval of the request by Buell Consulting, Inc.,on behalf of <br /> Verizon Wireless for an Interim Use Permit to install a temporary wireless <br /> telecommunications tower facility at 17610 Tyler St. NW with the following <br /> conditions: <br /> 1. The IUP shall expire on December 16,2021, or upon removal of the <br /> temporary tower facility. <br /> 2. The city shall approve a lease agreement with Buell <br /> Consulting/Verizon Wireless prior to construction or installation of <br /> any equipment. • <br /> 3. Sidewalks shall not be obstructed and must remain open to non- <br /> motorized traffic at all times. <br /> 4. Roads must be kept free of debris at all times during construction and <br /> operation. Sweeping must be completed within 12 hours of <br /> notification. <br /> 5. After the IUP expires or the use has ceased, the site must be returned <br /> to its original condition within 30 days. <br /> Motion carried 7-0. <br /> 5.2. Copart Phase II — 75-712-0010, 75-712-0030, & 75-712-0040 <br /> ■ Conditional Use Permit to Operate a Salvage Yard, Case No. CU 19-09 <br /> Mr.Leeseberg presented the staff report. <br /> Commissioner Thiel asked for clarification on the fence height. <br /> Mr.Leeseberg stated the fence height will need to be consistent with the Phase I <br /> condition,which states the remaining 100% opaque perimeter fencing shall be no <br /> less than six feet. <br /> Chair Johnson opened the public hearing. • <br /> ► avEaEa ar <br /> NATURE <br />
The URL can be used to link to this page
Your browser does not support the video tag.