My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.2. SR 12-16-2019
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2019
>
12-16-2019
>
7.2. SR 12-16-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 10:40:33 AM
Creation date
12/13/2019 9:45:41 AM
Metadata
Fields
Template:
City Government
type
SR
date
12/16/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BUELL CONSULTING, INC. <br /> 720 Main Street,Suite 200 <br /> BU = LL Saint Paul,MN 55118 <br /> (651)361-8110 <br /> www.buellconsulting.com <br /> 4. How long will the Facility be on the property? <br /> The temporary Facility may be on site as little as 2-3 months or as long as 24 months. The <br /> expected duration of the use of the temporary Facility is around 6 months. The time the Facility will <br /> remain on the property is purely dependent on how long it takes to complete real estate and regulatory <br /> due diligence and installation of equipment on the future permanent relocation site. The owner of the <br /> permanent relocation site is working diligently with Verizon to complete the relocation installation as <br /> quickly as possible. Verizon and the Economic Development Authority are working on a temporary site <br /> lease agreement as of the writing of this narrative. The Facility will not be installed until after the <br /> agreement is finalized by the parties. <br /> 5. What equipment will be placed on the property? <br /> The temporary Facility will include the placement of a 120-foot-tall ballasted monopole. The <br /> monopole will be attached to a precast foundation system which will serve as ballast to keep the <br /> monopole secure and standing. The precast foundation will consist of large concrete blocks that will be <br /> set on the ground, creating a 28'x 28'slab. The blocks will be tied together with a network of heavy <br /> gauge rebar. No permanent foundation will be poured. <br /> Utilities will need to be brought to the Facility,including power and fiber optic lines. To avoid <br /> creating a tripping and plowing hazard,the intent is to bury the utilities in a shallow trench such that <br /> they do not cross over the sidewalk on the south and east side of the property. The utilities will be <br /> routed in a 20-foot wide access and utilities easement between the public right-of-way and the Facility. <br /> Base station equipment necessary for the operation of antennas and equipment on the <br /> monopole will be placed on the precast foundation. Should additional base station equipment be <br /> required,a truck or trailer known as a Cell on Wheels("COW) may be placed alongside the precast <br /> foundation. <br /> 6. How will the Facility be accessed? <br /> No driveway will be installed nor will any curb cutting occur. Vehicles will drive on top of the <br /> existing grade as needed; otherwise,the Facility will be accessed on foot. <br /> 7. What happens when the Facility is no longer needed? <br /> Once the permanent relocation to the GRE site is up and running,Verizon will remove its <br /> equipment and improvements from the EDA's property and restore the property to its original <br /> condition. <br /> Cover Letter-STC Elk River Temp 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.