My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.2. SR 12-16-2019
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2019
>
12-16-2019
>
7.2. SR 12-16-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 10:40:33 AM
Creation date
12/13/2019 9:45:41 AM
Metadata
Fields
Template:
City Government
type
SR
date
12/16/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��i <br /> Eof <br /> lk — - Request for Action <br /> River <br /> To Item Number <br /> Mayor and City Council 7.2 <br /> Agenda Section Meeting Date Prepared by <br /> Public Hearin December 16, 2019 Zack Carlton,Planning Manager <br /> Item Description Reviewed by <br /> Interim Use Permit:Verizon Wireless, 17610 Tyler Chris Leeseber , Senior Planner <br /> St. NW- Install a Temporary Telecommunications Reviewed by <br /> Tower Cal Portner, City Administrator <br /> Action Requested <br /> Approve,by motion,an Interim Use Permit (IUP) with the following conditions: <br /> 1. The IUP shall expire on December 16, 2021, or upon removal of <br /> the temporary tower facility. <br /> 2. The city shall approve a lease agreement with Buell Consulting, <br /> Inc./Verizon Wireless prior to construction or installation of any <br /> equipment. <br /> 3. Sidewalks shall not be obstructed and must remain open to non- _ <br /> motorized traffic at all times. CR 33 <br /> 4. Roads must be kept free of debris at all times during construction <br /> and operation. Sweeping must be completed within 12 hours of <br /> notification. <br /> 5. After the IUP expires or the use has ceased,the site must be RR <br /> returned to its original condition within 30 days. <br /> HwY 16 <br /> Background/Discussion _ CR 12 <br /> Case No. IU 19-04 - Buell Consulting, Inc.,has requested approval of <br /> an IUP to install and operate a 120-foot tall temporary wireless Vit,. • <br /> communication tower at 17610 Tyler St. NW. Verizon Wireless must <br /> relocate existing equipment from the Great River Energy plant prior to <br /> demolition next spring. Buell Consulting is looking for a permanent y <br /> location to replace the lost infrastructure but Verizon requires a <br /> temporary location to ensure wireless communication is not disrupted <br /> during construction. They are looking to establish a temporary,up to <br /> 24 months,location for the communication tower. Figure i <br /> The property is owned by the city's Economic Development Authority (EDA) and will need to approve a <br /> lease agreement with the applicant prior to construction/placement of any equipment. <br /> Planning Commission <br /> The Commission held a public hearing discussing the item on November 26, 2019. No one spoke for or <br /> against the application, and no additional comments have been received. The Commission unanimously <br /> recommended approval. <br /> The Elk River Vision <br /> A welcoming community with revolutionary and spirited resourcefulness, exceptional p Q w E A E o s r <br /> service, and community engagement that encourages and inspires prosperity /` UR <br />
The URL can be used to link to this page
Your browser does not support the video tag.