Laserfiche WebLink
Elk River Public Library Board Page 7 <br /> July 23,2019 <br /> • items. The walk through started with the pavers directly out the front <br /> door of the library. Items identified and updated: <br /> -Pavers in front by the tables will be replaced with concrete;although <br /> they are flaking they are still compliant. <br /> -Landscaping rocks have been filled in over the drain area that was <br /> washing out in the back of the library <br /> -Mr. Femrite explained that the City staff maintains the rain garden based <br /> on horticulture recommendations <br /> -Commissioner Dreissig asked Mr. Femrite to have the dead bushes in <br /> the rain garden removed and he said he will follow up with the staff. <br /> -Councilmember Christianson asked Mr. Femrite about the weed <br /> removal in the cracks on the sidewalk around the parking lot and Mr. <br /> Femrite said he would follow up. <br /> -The bench needs to be re-stained. The garden boxes have been replaced <br /> with newer boxes that look nice. <br /> 6. Adjournment <br /> Moved by Commissioner Stoffers and seconded by Commissioner Eberley to <br /> adjourn the meeting. Motion carried 5-0.The meeting adjourned at 7:37pm. <br /> Minutes submitted by Dawn Larson. <br /> tr <br /> Tina Allard, City Clerk <br /> • <br /> Mary Keif eun, air <br /> 11111 <br /> 11 / EIEI • � <br /> NATURE <br />