My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.1. SR 12-02-2019
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2019
>
12-02-2019
>
10.1. SR 12-02-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2019 11:37:45 AM
Creation date
11/27/2019 9:49:36 AM
Metadata
Fields
Template:
City Government
type
CCM
date
12/2/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Description of Project Narrative <br /> <br /> <br /> <br />To whom it concerns, this is our description of our planned project in Elk River Mn. <br /> <br />For the Parcel id’s 75/8560105 and 0110 we propose to curb, pave and fence in each parcel. On either <br />one of the parcels we would like to use it for semi-trailer parking. We will park up to 100 trailers in <br />the area. No unloading just storage for our overflow parking needs. 7- days per week operation here <br />at MTL companies, but we after the yard is filled up, we really don’t go back there until our customers <br />request the trailer back to their facility. 90% of our fast-moving trailers will be at our Brooklyn Park <br />Facility. This site will be used for long term rentals. We don’t want to be driving to ER on a daily basis <br />if we don’t need too. <br /> No building on the site as of now. <br />No signage will be needed for us. <br />Fence screening avail upon request. <br />Curbed and paved. <br />Landscaped if needed. <br /> <br /> <br />The other parcel we would propose the following use; Recycle Process Center. <br /> <br /> The material would start from our location in Brooklyn Park, MN. The material is regular leaves from <br />trees and small branches under 3 inches. Since we are a licensed hauler, we would haul a trailer load <br />up to the Elk River, at that point we would dump the load into our concrete bunker with a cement <br />floor. After that the material would be loaded into our shredder which is about a size of a small semi- <br />trailer which is on wheels. As the material gets shredded it would be conveyed into another trailer for <br />delivery to a partner company. The material on a scale from 1-10 smells about a 4, but we would not <br />stockpile the material for more than 24 hours. In turn by Friday all of the material would be off the <br />ground and in trailers or gone from the property. <br /> <br />The small composting process is only going on for 2 months in the spring and 2-3 in the fall. We only <br />shred our leaves and nobody else’s, so this operation would only last a few hours a day and nothing on <br />weekends. <br /> <br />No building on the site as of now. <br />No signage will be needed for us. <br />Fence screening avail upon request. <br />Curbed and paved. <br />Landscaped if needed. <br />One employee there to do the shredding and trucking the materials. <br />Storage would not exceed more than 300 yards of material <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.