My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. PCSR 11-26-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2019
>
11-26-2019
>
5.2. PCSR 11-26-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2019 10:06:54 AM
Creation date
11/22/2019 10:02:45 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
11/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
880885890877878879881882883884886887888889891892 <br />880877878879881 882875873874876877878879875880871872873874876877878879 875 873874876876877877878878879879880879881882877877878879880876877878879 <br />885 <br />890 <br />881882883884886887 <br />888 <br />889891892893894 <br />881875 872873874876877878 875876877878875873874876877875 <br />876876 <br />88088589 <br />0877878879 <br />881 <br />882 <br />883884886887 <br />888 <br />889 <br />891 8808 <br />8 <br />5 8768778788798 <br />8 <br />1 <br />8 <br />8 <br />2 <br />8 <br />8 <br />3 <br />8 <br />8 <br />4 <br />8 <br />8 <br />6 <br />885883884 <br />886 <br />887 <br />890 <br />887888889891885890884886887888889891890891892890888889891892 875871872873874876877878879880885881882883884886877878ST <br />EXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX <br />XXXXXXXXXXXXXX <br />XXXXXXXXXXXXXXXXXXXSTOSTOSTOSTO STOSTOSTOSTOSTO STO STO STO 876877878877 <br />87 <br />8878 <br />8 <br />7 <br />7 <br />890888STOSTO877878 <br />8858908848868878888898918928938948778788798858908958 <br />8 <br />3884 <br />8 <br />8 <br />6887 <br />8888898918928938948808858788798818828838848868 <br />8 <br />6 8878 <br />8 <br />7880878879881882880885878879881882883884886887888885 <br />890 <br />8 <br />8 <br />2 <br />8 <br />8 <br />3 <br />884 <br />886 <br />887 <br />888 <br />889 <br />891 <br />89 <br />2 <br />89 <br />3 <br />880878879 <br />886887888875 872873874876877 875876877879879 <br />880885880885OUTLOT A <br />LOT 1 <br />BLOCK 1 <br />162ND AVENUE NW <br />161ST AVENUE NW <br />(502.19)(1321.85)(210.02)(213.53)(507.05)XXXXXXX X X X X X X X X X X <br />XXXXXXX X X <br />XXXX X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX <br />XXXXXXXXXXXXXXXXXXXXXXXXXXX <br />XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X XXX X X XXXXXXPROPOSED BUILDINGFFE=889.00SINGLE-STORY80'x160'6,400 SF - OFFICE6,400 SF - SHOPINFILTRATION BASININFILTRATIONBASINSTORWMATERPONDPRE <br />V <br />I <br />O <br />U <br />S <br /> <br />P <br />H <br />A <br />S <br />E SFSFSFSFSFSF <br />SFSFSFSFSFSFSF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF <br />SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF <br />SFSF SF SF <br />SHEET NUMBER:VERTICAL SCALE:DATE:OFHORIZONTAL SCALE:DRAWN:CHECKED:DESIGNED:INITIAL ISSUE:REVISIONS:Phone(320) 253-94953701 12th Street North, Suite 206Fax(320) 358-2001St. Cloud, MN 56303Toll Free(800) 270-9495DATE:LICENSE NO.I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY MEOR UNDER MY DIRECT SUPERVISION AND THAT I AM ADULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWSOF THE STATE OF MINNESOTAPREPARED FOR:N:\0022825.00\DWG\CIVIL\PRELIM\0022825EC01.DWG <br />86ELK RIVER, MN10/28/19JSBBCWDWRCOPART ELK RIVER: PHASE 2EROSION CONTROL PLANCOPART ELK RIVER: PHASE 210/28/195483210/28/19JOHN S. BLENKERFOR PERMIT APPROVAL© 2019 Westwood Professional Services, Inc.Common Ground AllianceCall 48 Hours before digging:811 or call811.com0'60'120'180'1" = 60'..........60'12' or 6'PROJECT NUMBER: 0022825.00PROPERTY LINESILT FENCEPOND NORMAL WATER LEVELROCK CONSTRUCTION ENTRANCEEROSION CONTROL BLANKETEMERGENCY OVERFLOWSTORM SEWERDRAIN TILEWATER MAINSANITARY SEWERINLET PROTECTIONEXISTINGPROPOSEDINDEX CONTOURINTERVAL CONTOURCURB AND GUTTERFLARED END SECTION (WITH RIPRAP)TURF REINFORCEMENT MATEROSION CONTROL LEGEND1.ALL SILT FENCE AND OTHER EROSION CONTROL FEATURES SHALL BE IN-PLACE PRIOR TOANY EXCAVATION/CONSTRUCTION AND SHALL BE MAINTAINED UNTIL VIABLE TURF ORGROUND COVER HAS BEEN ESTABLISHED. EXISTING SILT FENCE ON-SITE SHALL BEMAINTAINED AND OR REMOVED AND SHALL BE CONSIDERED INCIDENTAL TO THEGRADING CONTRACT. IT IS OF EXTREME IMPORTANCE TO BE AWARE OF CURRENT FIELDCONDITIONS WITH RESPECT TO EROSION CONTROL. TEMPORARY PONDING, DIKES,HAYBALES, ETC., REQUIRED BY THE CITY SHALL BE INCIDENTAL TO THE GRADINGCONTRACT.2.EROSION AND SILTATION CONTROL (ESC): THE CONTRACTOR SHALL ASSUME COMPLETERESPONSIBILITY FOR CONTROLLING ALL SILTATION AND EROSION OF THE PROJECT AREA.THE CONTRACTOR SHALL USE WHATEVER MEANS NECESSARY TO CONTROL THE EROSIONAND SILTATION INCLUDING BUT NOT LIMITED TO: CATCH BASIN INSERTS, CONSTRUCTIONENTRANCES, EROSION CONTROL BLANKET, AND SILT FENCE. ESC SHALL COMMENCE WITHGRADING AND CONTINUE THROUGHOUT THE PROJECT UNTIL ACCEPTANCE OF THE WORKBY THE OWNER. THE CONTRACTOR'S RESPONSIBILITY INCLUDES ALL IMPLEMENTATION ASREQUIRED TO PREVENT EROSION AND THE DEPOSITING OF SILT. THE OWNER MAY DIRECTTHE CONTRACTOR'S METHODS AS DEEMED FIT TO PROTECT PROPERTY ANDIMPROVEMENTS. ANY DEPOSITION OF SILT OR MUD ON NEW OR EXISTING PAVEMENT ORIN EXISTING STORM SEWERS OR SWALES SHALL BE REMOVED AFTER EACH RAIN EVENT.AFFECTED AREAS SHALL BE CLEANED TO THE SATISFACTION OF THE OWNER, ALL AT THEEXPENSE OF THE CONTRACTOR. ALL TEMPORARY EROSION CONTROL SHALL BE REMOVEDBY THE CONTRACTOR AFTER THE TURF IS ESTABLISHED.3.ALL STREETS DISTURBED DURING WORKING HOURS MUST BE CLEANED AT THE END OFEACH WORKING DAY. A CONSTRUCTION ENTRANCE TO THE SITE MUST BE PROVIDEDACCORDING TO DETAILS TO REDUCE TRACKING OF DIRT ONTO PUBLIC STREETS.4.WHEN INSTALLING END-OF-LINE FLARED END SECTIONS, BRING THE SILT FENCE UP &OVER THE FLARED END SECTIONS & COVER DISTURBED AREAS WITH RIP RAP. THEUPSTREAM FLARED END SECTIONS SHALL HAVE WOOD FIBER BLANKET INSTALLED ON THEDISTURBED SOILS.5.ALL UNPAVED AREAS ALTERED DUE TO CONSTRUCTION ACTIVITIES MUST BE RESTOREDWITH SEED AND MULCH, SOD, EROSION CONTROL BLANKET OR BE HARD SURFACEWITHIN 2 WEEKS OF COMPLETION OF CONSTRUCTION.6.THE SITE MUST BE STABILIZED PER THE REQUIREMENTS OF THE MPCA, NPDES, MNDOT,AND CITY.A.TEMPORARY (GREATER THAN 1-YEAR) SEED SHALL BE MNDOT SEED MIX 22-111 AT30.5-POUNDS PER ACRE.B.TEMPORARY (LESS THAN 1-YEAR) SEED SHALL BE MNDOT SEED MIX 21-112 (FALL) OR21-111 (SPRING/SUMMER) AT 100-POUNDS PER ACREC.INFILTRATION/FILTRATION BASIN SHALL BE MNDOT SEED MIX 34-262 AT14.5-POUNDS PER ACRE.D.POND SLOPES SHALL BE MNDOT SEED MIX 33-261 AT 35-POUNDS PER ACRE.E.GENERAL SEEDING SHALL BE MNDOT SEED MIX 25-151 AT 70-POUNDS PER ACRE.F.MULCH SHALL BE MNDOT TYPE 1 APPLIED AT 2-TONS PER ACRE.9.FOR AREAS WITH SLOPE OF 3:1 OR GREATER, RESTORATION WITH SOD OR EROSIONCONTROL BLANKET IS REQUIRED.10.ALL TEMPORARY STOCKPILES MUST HAVE SILT FENCE INSTALLED AROUND THEM TO TRAPSEDIMENT.11.ALL PERMANENT PONDS USED AS TEMPORARY SEDIMENT BASINS DURINGCONSTRUCTION SHALL BE DREDGED AFTER THE SITE HAS BEEN STABILIZED TO RESTORETHE POND TO THE PROPOSED BOTTOM ELEVATION.12.ALL CONSTRUCTION SHALL CONFORM TO LOCAL AND STATE RULES INCLUDING THENATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMITREQUIREMENTS.13.THE SITE MUST BE KEPT IN A WELL-DRAINED CONDITION AT ALL TIMES. THECONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARY DITCHES, PIPING OR OTHERMEANS REQUIRED TO INSURE PROPER DRAINAGE DURING CONSTRUCTION. LOW POINTSIN ROADWAYS OR BUILDING PADS MUST BE PROVIDED WITH A POSITIVE OUTFLOW.14.PUBLIC STREETS USED FOR HAULING SHALL BE KEPT FREE OF SOIL AND DEBRIS. STREETSWEEPING SHALL BE CONCURRENT WITH SITE WORK.GENERAL EROSION CONTROL NOTESE.O.F.HEAVY DUTY SILT FENCEREDUNDANT SILT CONTROL982980982980
The URL can be used to link to this page
Your browser does not support the video tag.