My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. PCSR 11-26-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2019
>
11-26-2019
>
5.1. PCSR 11-26-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2019 4:17:58 PM
Creation date
11/21/2019 4:16:26 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
11/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BUELL CONSULTING, INC. <br />720 Main Street, Suite 200 <br />Saint Paul, MN 55118 <br />(651) 361-8110 <br />www.buellconsulting.com <br />Cover Letter-STC Elk River Temp 5 <br /> <br />• Hours of operation: The Facility will operate 24 hours a day for the duration of its use. <br />• Number of Employees: The Facility will be unmanned. Personnel will visit the site as needed. <br />• Number of parking stalls, existing and additional: No parking stalls will exist on site nor will any be created for this Facility. <br />• Is there proposed screening of the site? A fence will surround the precast foundation system to deter unauthorized access. <br />• Proposed building materials/compliance with design standards: The precast foundation will be comprised of concrete and rebar. The monopole will be made of galvanized steel. Mechanical equipment (base station, antennas, radios and so forth) will be installed as supplied by manufacturers. The materials comply insofar as Section 30.1837 of the Elk River Code of Ordinances requires commercial wireless telecommunication service towers to be of monopole design. <br />• Signage: No signage will be placed at the Facility beyond that which is required by local, state, and federal agencies. <br />• Is there outdoor storage? No equipment, possessions, or materials will be stored on site that do not pertain to the intended use of the Facility as a temporary wireless telecommunications site. <br />• Waivers to application materials respectfully requested by applicant: 1. Landscape Plan: As this Facility is of a temporary nature, no landscaping is proposed. 2. Grading/Drainage Plan: As this Facility will temporarily encumber a small ground space (no more than 1% of the total area of the property) no plan for grading or drainage is proposed. Grading will occur only insofar as to scrape level the area under the precast concrete foundation supporting the monopole. 3. Floor Plans: No floor plans are included herein (not applicable).
The URL can be used to link to this page
Your browser does not support the video tag.