My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1 ERMUSR 11-12-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
11-12-2019
>
4.1 ERMUSR 11-12-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2019 2:59:37 PM
Creation date
11/8/2019 2:58:31 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
11/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities <br /> A.14—Meter Testing Procedure <br /> 1.0 Procedure for Meter Testing <br /> A. On complaints concerning high bills, and where a meter check is indicated, the Utility <br /> will test the meter using calibration equipment under generally accepted industry <br /> procedures. <br /> B. If a customer requests the testing of his/her electric and/or water meter because of high <br /> bills,they shall deposit with the Utility the sum of$50.00 for this test and it shall be paid <br /> prior to testing. <br /> C. If the meter is found to be inaccurate within plus or minus three percent(3%),the fee will <br /> be retained by the Utility. If the meter is found to be in error beyond these limits,the <br /> Utility will bear the cost of testing and return the $50.00 fee and adjust the customer's <br /> bill in the amount of the error for the past six(6)month period. <br /> 118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.