My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.2. SR 11-04-2019
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2019
>
11-04-2019
>
10.2. SR 11-04-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2019 10:12:28 AM
Creation date
11/1/2019 10:09:28 AM
Metadata
Fields
Template:
City Government
type
SR
date
11/4/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Plan <br />City of Elk River, Minnesota <br />Project # STM -1 <br />Project Name Storm Water projects <br />2020 thru 2024 <br />Department <br />Storm Water <br />Contact <br />Storm Water Coordinator <br />Type <br />Maintenance <br />Useful Life <br />Unassigned <br />Category <br />Maintenance Projects <br />Description <br />Biannual pond cleating, stormwater repairs, BMP inventory. <br />?020 - Dodge Ave south of 8th St - Basin 197 <br />?023 - Trott Brook <br />Storm water infrastructure projects combined with street projects are included on the pavement management CIP sheet.) <br />Justification <br />Chese projects include the testing, removal, and disposal of sediment deposits from our stormwater ponds. This is needed to assure the storm water <br />ystem is functioning as designed and achieving the water quality standards of our NPDES permit. <br />Che smaller stormwater repairs include minor pipe upsizing, culvert replacement, manhole and catch basin repairs and fixing of washout areas. <br />Expenditures <br />2020 2021 <br />2022 2023 2024 <br />Total <br />Construction/Maintenance <br />200,000 <br />250,000 <br />450,000 <br />Total <br />Funding Sources <br />200,000 <br />2020 2021 <br />250,000 <br />2022 2023 2024 <br />450,000 <br />Total <br />Storm Water <br />200,000 <br />250,000 <br />450,000 <br />Total <br />200,000 <br />250,000 <br />450,000 <br />2020-2024 CAPITAL IMPROVEMENT PLAN <br />
The URL can be used to link to this page
Your browser does not support the video tag.