My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.7. SR 11-04-2019
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2019
>
11-04-2019
>
4.7. SR 11-04-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2019 8:11:31 AM
Creation date
11/1/2019 8:04:12 AM
Metadata
Fields
Template:
City Government
type
SR
date
11/4/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Eclty1� ,.,�� Request for Action <br /> River <br /> To Item Number <br /> Mayor and City Council 4.7 <br /> Agenda Section Meeting Date Prepared by <br /> Consent November 4, 2019 Justin Femrite, P.E. Public Works Director <br /> Item Description Reviewed by <br /> Active Elk River - Multipurpose Facility Bid Award Cal Portner, City Administrator <br /> Reviewed by <br /> Action Requested <br /> Approve,by resolution, award of bid package 6A-Carpentary for the Multi-Purpose Facility to the low <br /> bidder of Ebert,Inc. and reassign this contract to RJM. <br /> Background/Discussion <br /> On July 1,when considering bids for the Multi-Purpose facility,package 6A-Carpentary was not awarded <br /> due to the apparent low bidder asking to pull their bid from consideration. At that time, a value was <br /> carried, as part of Guaranteed Maximum Price (GMP) for the project which reflected the expected cost <br /> for the work originally included in the 6A category. Since that time,RJM has reworked category 6A. The <br /> rework to the package did not change any design elements of the project but instead separated some <br /> quote packages for work that made more sense to stand on its own for more contractors to provide <br /> competitive pricing. This work simplified the 6A category which was then rebid. <br /> Bids were opened on October 23 with 2 bidders delivering bids. The low bidder was Ebert Construction <br /> with a bid of$546,800. We are recommending award of this amount. <br /> Financial Impact <br /> The original bid category 6A was assigned an allowance value of$1,300,000 in the GMP. When adding <br /> the costs for the revised category 6A bid and the quote category costs to complete the full intended scope <br /> of the original 6A category, the numbers collectively result in a net position of$15,632 less than the <br /> $1,300,000. We will track this cost savings in the project contingency summary. <br /> Attachments <br /> ■ Resolution <br /> The Elk River Vision <br /> A PehoMing community 2a itb revolutionary and spirited resourcefulness, exceptional POWERED By <br /> service, and community engagement that encourages and inspires prosperity INAMIRE1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.