My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5. SR 11-04-2019
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2019
>
11-04-2019
>
4.5. SR 11-04-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2019 4:08:40 PM
Creation date
10/31/2019 4:07:30 PM
Metadata
Fields
Template:
City Government
type
SR
date
11/4/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Not-To-Exceed Fee | 27A Proposal for Lake Orono Restoration and Enhancement (LORE) for the City of Elk River <br />Not-To-Exceed Fee <br />Construction Services are based on a <br />14 week construction schedule. <br />429 Assessment Services: work <br />related to responding to contested <br />assessments, completing appraisals <br />in relation to supporting the <br />assessments, or attending meetings <br />or hearings related to contested <br />assessments will be outside this <br />scope of work. <br />Rate Per Hour $133 $185 $124 $102 $133 $124 $100 $133 $94 $115 $140 $150 $190 <br />1 Project Management/Communication Services 24 8 8 40 $5,664 <br />1.1 Communication <br />2 Design Services 44 28 156 172 20 10 4 8 442 $53,406 <br />2.1 TAP Meetings (Three) <br />2.3 50% Design Plans <br />2.4 50% Design Specifications <br />2.3.1 Submit 50% Design Plans and Specification to City for Review <br />2.3.2 50% Design Plan Review Meeting <br />2.4.3 QA/QC Review <br />2.5.3 Engineers Construction Cost Estimate <br />2.5 Finalize 90% Design Plans <br />2.5.1 Finalize 90% Specifications <br />2.5.2 Finalize SWPPP <br />2.5.3 Update Engineers Construction Cost Estimate <br />2.5.4 QA/QC Review <br />2.5.5 Submit Final Plans and Specifications <br />2.6 Public Board Meetings <br />3 Survey Services 6 16 32 56 64 174 $26,606 <br />3.1 Pre-Construction Lake Survey <br />3.2 Post-Construction Lake Survey (per Stage) <br />3.3 Access/Easement Preparation <br />3 Permitting Services 12 28 72 112 $13,996 <br />3.1 MNDNR Public Waters <br />3.2 MNDNR Dewatering Permit <br />3.3 US Army Corps of Engineers <br />3.4 MPCA NPDES <br />4 Bid and Contract Services 10 32 28 70 $8,154 <br />4.1 Coordinate Project Advertisement <br />4.2 Issue Bidding Documents <br />4.3 Answer Bidder's Questions <br />4.4 Attend Public Bid Opening <br />4.5 Prepare Tabulation of Bids <br />4.6 Provide Recommendation of Award <br />5 Construction Services 16 72 16 16 204 24 48 396 $47,936 <br />5.1 Prepare Contract Documents <br />5.2 Coordinate and Attend the Pre-Construction Meeting <br />5.3 Review and Process Shop Drawings and Submittals <br />5.4 Address Contractor Questions <br />5.5 Process Partial Pay Estimates <br />5.6 Prepare Record Drawing and Final Closeout Paperwork <br />5.7 Construction Observations (Total Estimated Hours Based on One <br />Year Construction Season) <br />5.8 Permit Compliance Inspection <br />5.9 Construction Staking <br />6 429 Assessment Services 2 2 8 64 76 $8,812 <br />6.1 Summary Report <br />6.2 Public Hearings (Three) <br />114 38 312 256 36 72 204 10 4 64 8 64 112 1234 <br />Total Cost of Services $164,574 <br />Licensed <br />Surveyor <br />Two Person <br />Survey Crew Total Hours Total Labor <br />Cost <br />Total Hours <br /> <br /> Shawn Williams Permit <br />Specialist <br />Construction <br />Services Technician <br />Tony Havranek <br />Fisheries Specialists <br /> Mary Newman <br />Fisheries <br />Specialists <br />Faye Gillespie <br />Land Assessment <br />Candace Amberg <br />Recreation <br />Specialist <br />TASK | DESCRIPION Luke Lunde <br />Project Manager <br />Pete Willenbring <br />Principal <br />Amy Anderson <br />Project Engineer <br /> Laura Cummings <br />Graduate Engineer <br />Luke Lunde <br />Habitat <br />Restoration <br /> <br />G:\Group Data\Natural Resources\Proposals\Elk River\Lake Orono Permitting and Design\WSB Lake Orono Task List and Fee Spreadsheet_FInal
The URL can be used to link to this page
Your browser does not support the video tag.