My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1d ERMUSR 10-08-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2019
>
10-08-2019
>
6.1d ERMUSR 10-08-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2019 4:18:42 PM
Creation date
10/4/2019 4:18:42 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
10/8/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> ERMU Commission Mike Tietz—Technical Services Superintendent <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> October 8, 2019 6.1d <br /> SUBJECT: <br /> Staff Update <br /> ACTION REQUESTED: <br /> None <br /> DISCUSSION: <br /> • In September, the locating department had a total of 467 locate tickets consisting of six <br /> emergency tickets, 13 cancellations, 408 normal tickets and 40 updated tickets.This is a <br /> 3.3% increase in volume of tickets from the previous month. <br /> • On September 17, two crews, each consisting of an office and a field staff member <br /> changed out meters within Areas 7 & 8, completing the change out of 106 meters in one <br /> day. This completes the 2015 Service Territory Transfer agreement a year ahead of <br /> schedule. The metering department would like to express their gratitude to the office <br /> staff for their assistance during the past few transfers. They have been instrumental in <br /> recording data accurately in the field that is utilized by Customer Information Systems. <br /> This has also allowed the field staff to stay focused on their task and work safely, <br /> without distractions. Field staff also disconnected all the load management radios <br /> within these areas and has been working on transitioning nine of these customers from <br /> a Connexus single metering rate. By adding an additional meter package, we will be able <br /> to transition these customers to our existing programs. This work should be completed <br /> next week. <br /> • On September 26, staff ran Engines 1, 3 & 4 without any issues. We have a vendor that <br /> is planning to diagnose and repair Engine 2 in mid-November. We will also have them <br /> take a look at Engine 3 at that time. It has been producing excessive smoke during <br /> multiple startups. <br /> • Mapping department continues to update points and attributes for all of our systems <br /> assets within the ESRI ArcView GIS system. Power Systems Engineering (PSE) has started <br /> on our ESRI upgrade along with the disaster recovery backup server build for GIS. PSE is <br /> working directly with city IT staff on this. <br /> • Structural Buildings has the building materials onsite for the West Substation Equipment <br /> Storage Garage. The grading and pad site were completed around the middle of <br /> Page 1 of 2 <br /> 263 <br />
The URL can be used to link to this page
Your browser does not support the video tag.