My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 10-8-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2019
>
10-08-2019
>
4.1. ERMUSR 10-8-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2019 4:00:31 PM
Creation date
10/4/2019 4:00:19 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
10/8/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ERMU Commission Policy Manual Table of Contents <br /> E.2 Distribution Reliability Standard (Management per G.4e) <br /> E.3 Integrity Testing Policy (Add to tariffs) <br /> E.4 Mid-Block Street Lighting <br /> E.5 Mutual Aid Policy (Moved to C.4r) <br /> E. Pole Attachment '`olicy <br /> E.6a Pole Attachment Agreement <br /> E.7 Pole Disposal Policy (Redundant, Included in P.15) <br /> E.7a Pole Disposal Agreement <br /> E.8 Pole Move Procedure <br /> E.9 Street l,lh ;nstruction Standards <br /> E.10 Street Light Installation and Maintenance Memorandum of Understanding <br /> (Move to G.2a2) <br /> E.11 Two-Way Radio Guidelines <br /> E.12 Distributed Energy Resources and Net Metering Policy (Standalone policy) <br /> E.12a Rules Governing the Interconnection of Cogeneration and Small Power Production <br /> (Standalone policy) <br /> E.12b Cogeneration and Small Power Production Tariff (Standalone policy) <br /> WA-TER <br /> W.1 Water Department Rules-Operations and Maintenance Manual <br /> • Sections will be cut and included in new commission policy G.4e1 <br /> W.2 Water Distribution System Maintenance Program <br /> W.3 Customer Contact for Water Meter Change-Out <br /> W.4 Fire Hydrant Use and Maintenance <br /> W.5 Looping Water Mains <br /> W.6 Payment of Private Water Line Connection and Repair Costs <br /> Memorandum of Understanding (Moved to G.2a3) <br /> W.6a Payment and Assessment of the Costs to Repair Private Utility Lines <br /> City Policy(for reference only) <br /> W.6b Payment and Assessment of the Costs to Repair Private Utility Lines <br /> City Ordinance (for reference only) <br /> W.6c Petition, Waiver and Agreement for Payment of the Cost of Repairs to Private <br /> Utility Lines (Not policy. This is the form used to apply.) <br /> W.7 Side Lot Easements (Needs to be a requirement of the developer for looping <br /> mains per W.5) <br /> W.8 Water Shut-Off Request (Not policy. This is the request form.) <br /> W.8a Water Shut Off City Ordinance (for reference only), <br /> W.9 Water Use Restrictions (Moved to G.4o1) <br /> W.9a Water Use Restrictions City Ordinance (for reference only). <br /> W.10 Wellhead Protection Plan (Standalone, not part of Governance Policies.) <br /> Page 6 of 6 <br /> 63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.