Laserfiche WebLink
<br /> <br /> UTILITIES, INC. <br /> 9656 161st Avenue NW <br /> Elk River, MN 55330 <br /> Phone (763) 633-3656 <br /> Fax (763) 633-3659 <br />September 26, 2019 <br />** VIA EMAIL ** <br />tom.druk@rjmconstruction.com <br />Tom Druk <br />RJM Construction <br /> <br /> <br /> <br />Re: Elk River Multi-Purpose Facility – Elk River <br /> Change Order Request - PR 2 3003/4249.30 <br /> <br />Tom, <br />I am requesting a change order in the amount of $ 4,249.30 as Extra to Contract for additional costs to make changes per PR #2. <br />Relocate STRM 7A that has already been installed. <br />Following is a breakdown of these costs; <br /> <br />Description Qty Unit Unit Cost Total <br />Modify CB 7A (remove and reinstall) 1 ls $ 375.00 $ 375.00 <br />490 excavator w/operator 6 hr $ 210.00 $ 1,260.00 <br />Skid loader w/operator 1 hr $ 180.00 $ 180.00 <br />RT82 trench roller 1 dy $ 320.00 $ 320.00 <br />Labor 18 hr $ 96.00 $ 1,728.00 <br />Total $ 3,863.00 <br />Add 10% overhead & profit $ 386.30 <br />Total Change order amount $ 4,249.30 <br /> <br />Please forward the necessary change order documentation in this amount at your earliest convenience, as we require prior to work <br />being completed. Should you have any questions or need additional information, please contact me. <br /> <br /> Sincerely, <br /> <br /> Ryan Van Nurden <br /> METRO UTILITIES, INC. <br />