Laserfiche WebLink
TO:RJM CONSTRUCTION <br />ATTN:TOM DRUK <br />PROJECT:ELK RIVER ICE ARENA PROJECT <br />DATE: 09/25/19 <br />CO# : <br />29 Wilson Ave NE, St Cloud MN 56304 <br />CONTACT NAME:NATE BEIER <br />Description Cost <br />Labor Total 3,999.60$ <br />10 % Overhead & Profit 399.96$ <br />Labor Total 4,399.56$ <br />Materials & Equipment Total 1,520.07$ <br />Tax on Materials & Equipment Only 119.71$ <br />SubTotal 1,639.78$ <br />10% Overhead & Profit 163.98$ <br />Material & Equipment Total 1,803.75$ <br />Subcontractors 1,168.30$ <br />5% Overhead & Profit on Subs 58.42$ <br />Subcontractor Total 1,226.72$ <br />TOTAL COST OF CHANGE 7,430.00$ <br />Labor By Task Hours Hourly Cost Total Cost <br />-$ <br />ADDED OVERFLOW DRAIN LABOR 36 90.90$ 3,272.40$ <br />ADDED 4" SANITARY WASTE UNDERGROUND 8 90.90$ 727.20$ <br />-$ <br />-$ <br />Sub-Total 3,999.60$ <br />Materials and Equipment By Task Total Cost <br />-$ <br />1,216.04$ <br />304.03$ <br />-$ <br />-$ <br />Sub-Total 1,520.07$ <br />Sub-Contractor Total Cost <br />-$ <br />636.30$ <br />532.00$ <br />-$ <br />Sub-Total 1,168.30$ <br />PR 2 - ADD ROOF DRAIN, ADD 4" <br />UNDERGROUND SANITARY <br />EXCAVATE/BACKFILL <br />INSULATION <br />ADDED OVERFLOW DRAIN, SEE DETAILS ATTACHED <br />ADDED 4" SANITARY WASTE UNDERGROUND, SEE DETAILS ATTACHED <br />COST SUMMARY