My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3. PCSR 09-24-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2019
>
09-24-2019
>
4.3. PCSR 09-24-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2019 9:44:00 AM
Creation date
9/20/2019 9:40:12 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
9/24/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The property is zoned Highway Commercial (C3) where auto body repair requires a Conditional Use <br />Permit (CUP). The applicant is requesting an amendment to their existing CUP (CU 16-09) to expand <br />their auto body repair business located at 21475 US Highway 169. <br /> <br />The property is bound by US Highway 169 on the west with a commercial concrete business across the <br />highway, two properties the applicant owns to the south, and the ERX Motor Park (an off-road racing <br />facility) to the east and north. <br /> <br />The property contains two structures. The pole building at approximately 2,300 sqft and the “house” <br />structure is approximately 1,500 sqft. <br /> <br />The applicant needs additional shop space (approximately 9,000 sqft) and will be constructing a new <br />separate building south of the “house” structure. The “house” structure will be utilized as office space. <br /> <br />The applicant has indicated there will be no outdoor storage. <br /> <br />The applicant has been operating the business on the adjoining property since 1998 and on the subject <br />parcel since 2016. Staff is unaware of any concerns, issues, or complaints with the use on the subject <br />property. In 2016, the properties zoning classification was change to C-3 Highway Commercial, allowing <br />the commercial use. <br /> <br />Analysis <br />Comprehensive Plan <br />The Gravel Mining Area Land Use, Transportation, and Utility Plan guide the properties for Highway <br />Business uses where commercial uses are allowed and encouraged. The proposed use is consistent with <br />the Comprehensive Plan. <br /> <br />Transportation/Circulation <br />Access to the site is off US Highway 169 in the northwest corner of the site. A portion of the driveway <br />crosses over the neighboring property to the north. The driveway is located within the setback <br />requirements but does not require a variance as it is an existing driveway. <br /> <br />Runoff from this new impervious surface (gravel is defined as impervious per MPCA guidelines) must be <br />treated. <br /> <br />Parking <br />The parking requirements for the proposed uses are one stall for every 300 square feet of area. The three <br />building are 12,900 square feet in size, requiring 43 stalls. Section 30-901 states all driving areas and <br />parking areas shall be bounded by B612 concrete curb and gutter. <br /> <br />The submitted plan does not indicate where these 43 stalls will be located. Prior to the City Council <br />review, the applicant will be required to submit a scaled site plan showing the required number of parking <br />stalls, paving material, and B612 concrete curb and gutter. If the applicant can demonstrate 43 stalls are <br />not initially needed, they will need to show proof of parking on the site. <br /> <br /> <br /> <br /> <br />\\\\DC3-ELKR\\Shared\\Departments\\Community Development\\Planning\\Case Files\\CUP\\CU 19-14 Haugland (Auto-Rec Bodyworks Inc)\\4- <br />Planning Commission\\9-24-2019\\4.3 sr CU 19-14 sr PC 9-24-2019.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.