Laserfiche WebLink
• The water department has continued to locate and validate existing areas of the <br /> distribution system to increase accuracy of system maps. <br /> • The contractor that will be sandblasting and repainting The Auburn Street Water Tower <br /> is set to start work on September 9. <br /> ATTACHMENTS: <br /> • August 2018 Pumping by Well <br /> Page 2 of 2 <br /> 220 <br />