My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 09-10-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
09-10-2019
>
4.1. ERMUSR 09-10-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2019 4:24:53 PM
Creation date
9/6/2019 4:24:45 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
9/10/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Voltage, Frequency, Harmonic and Flicker levels as defined in IEEE 1547 <br /> D l 1 standard during periods when the Customer Generator is operated in <br /> parallel with the Distribution System. <br /> (2)With Extended Parallel Operation, the Customer Generator is paralleled <br /> with the Distribution System in continuous operation. Special design, <br /> coordination and agreements are required before any extended parallel <br /> operation will be permitted. An interconnection study will need to be <br /> performed by ERMU to identify the issues involved. <br /> Protective devices are required to permit safe and proper operation of the <br /> Distribution System while interconnected with Customer Generator. In <br /> general, an increased degree of protection is required for a larger Customer <br /> Generator due to the greater magnitude of short circuit currents and the <br /> potential impact to Distribution System stability. Larger installations may <br /> require more sensitive and faster protection to minimize damage and ensure <br /> safety. Customer shall provide protective devices and systems to detect the <br /> Voltage, Frequency, Harmonic and Flicker levels as defined in IEEE 1547 <br /> D l 1 standard during periods when the Customer Generator is operated in <br /> parallel with the Distribution System. <br /> Section 4: Power Quality. Operation of Customer Generator and auxiliary <br /> equipment must not cause any reduction in the quality of service provided by <br /> ERMU to its customers nor interfere with the operation of ERMU's Distribution <br /> System or ERMU's power supplier's transmission system. The equipment shall not <br /> put any undesirable voltages, frequencies, or transients on to ERMU's Distribution <br /> System or ERMU's power supplier's transmission system. If any of the <br /> aforementioned events occur,the equipment shall be disconnected until such time <br /> as the harmful conditions have been corrected. Customer shall be responsible <br /> for taking any corrective action that may be required and/or reimbursing ERMU <br /> for the cost of corrective action which ERMU deems necessary to provide and <br /> restore services to prescribed limits. The Customer Generator will generate 3 phase, <br /> 60 hertz power when interconnected to ERMU's Distribution System at normal <br /> 12.47 Kv at a power factor of 95% lagging. Total Harmonic Distortion(THD) <br /> levels produced by the equipment shall be less than 1%in compliance with <br /> standards as defined by IEEE 519-1992. <br /> ARTICLE 5. INSURANCE. Customer shall maintain general liability insurance for the <br /> term of this agreement from a qualified insurance agency with a B+ or better rating by <br /> "Best" and with a combined single limit of not less than: <br /> 1) Two million dollars ($2,000,000) for each occurrence if the gross nameplate <br /> rating of the generation system is greater than 250 kW. <br /> 2) One million dollars (1,000,000) for each occurrence if the gross nameplate <br /> rating of the generation system is between 40 kW and 249 kW. <br /> Such general liability insurance shall include coverage against claims for damages resulting <br /> from i)bodily injury, including wrongful death; and(ii)property damage arising out of the <br /> customer's ownership and/or operation of the generation system under this agreement. <br /> 6 <br /> 136 <br />
The URL can be used to link to this page
Your browser does not support the video tag.