Laserfiche WebLink
Elk River <br /> Municipal Utilities <br /> ELECTRIC VEHICLE CHARGING RATES <br /> Residential and Commercial Electric Vehicle Charging Rate <br /> Available:Within Elk River Municipal Utilities (ERMU)established service territory. <br /> Applicable:To single family residences, non-demand and demand customers receiving service under <br /> another rate. <br /> Electric Vehicle Charging Rate:This Program is available to all customers of Elk River Municipal Utilities <br /> (ERMU)that own an electrically powered vehicle used for on road transportation. Charging of the <br /> vehicle can occur any time but will be subject to on-peak and off-peak energy charges per hour daily. <br /> On-peak hours are Monday through Friday between 10 AM and 10 PM. Off-peak hours are Monday <br /> through Friday between 10 PM and 10 AM,Saturdays,Sundays, and the following holidays( New Year's <br /> Day, Memorial Day, Independence Day, Labor Day,Thanksgiving Day, and Christmas Day). <br /> To qualify for the special rate,the customer shall provide: <br /> 1. Electric vehicle charging station that is used for the sole purpose of charging electric vehicles. <br /> This charging station must be 240 volt. <br /> 2. Customer is responsible for installation of the additional meter socket in a mutually agreed upon <br /> location. <br /> 3. Inspection by a State Certified electrical inspector of all metering equipment and provide an <br /> affidavit to ERMU when completed. <br /> Elk River Municipal Utilities shall provide: <br /> 1. All on-peak electric energy consumed by the electric vehicle charging equipment will be at the <br /> summer rate of$0.1270/kWh for the five monthly billing periods of June—October, and the <br /> winter rate of$0.1160/kWh for the seven monthly billing periods of November—May. <br /> 2. All off-peak electric energy consumed by electric vehicle charging equipment will be at the rate <br /> of$.0602/kWh. <br /> 3. The rate is subject to application of the Power Cost Adjustment (PCA). <br /> 4. This equipment will be available for charging at applicable rates 24 hours per day and is not <br /> subject to any load control strategies. <br /> 5. Electric meter. <br /> 6. Final inspection prior to meter activation to ensure only qualified loads are being supplied <br /> through the electric vehicle charging equipment. <br /> Public Electric Vehicle Charging Rate:This rate is available to anyone charging an electric vehicle or <br /> plugin electric vehicle at a public electric vehicle charging station owned and operated by ERMU within <br /> the ERMU service territory.All persons must have an active ChargePoint account or have the capability <br /> Page 1of2 <br /> 114 <br />