Laserfiche WebLink
MORATORIUM EFFECTIVE FEBRUARY 14, 2017 ON THE FOLLOWING LOAD CONTROL PROGRAMS <br /> Energy Management Program Rates <br /> 4. A meter to measure electricity consumed by the ETS water heater. <br /> 5. A load control device and meter socket to accommodate the off-peak meter. <br /> Cycled Air Conditioning: This Program is available to all customers served by ERMU who have central <br /> air conditioners. Program participants must allow installation of a utility supplied load control device so <br /> air conditioning demand can be reduced at critical times. This Program is subject to the following terms <br /> and conditions: <br /> 1. The Customer must have a conventional central air conditioner,ASHP or GSHP, of at least 2 <br /> tons capable of being interrupted with a 5 amp relay. <br /> 2. ERMU will furnish the load control device and pay to have it installed by a licensed <br /> electrician. Separate metering is not required. <br /> 3. The Customer must allow access for installation of the load control device during normal <br /> business hours. <br /> 4. The Customer must allow access for load control maintenance and compliance inspections <br /> by ERMU personnel during normal business hours. <br /> 5. Customers must agree to allow ERMU or its designee to remotely cycle their central air <br /> conditioner,ASHP or GSHP,off for approximately 15 minutes out of each 30 minute period <br /> at critical peak use times during the cooling season (May through September). Except for <br /> extreme emergencies,duration of said control will not exceed 6 hours per day and more <br /> than 200 hours total per cooling season. <br /> 6. Customers who elect to participate in this Program must remain on it for at least one <br /> cooling season or part of the load control installation costs may be assessed to the <br /> customer. <br /> 7. Customers with central air conditioners, ASHP or GSHP,that are grossly oversized for the <br /> conditioned space will not be allowed to participate.Such systems do not provide ERMU <br /> sufficient load reduction relief at critical peak use times. <br /> 8. The rate is subject to application of the Power Cost Adjustment(PCA). <br /> 9. Cycled AC Program participants will receive a $3 per month credit for allowing ERMU to <br /> interrupt their air conditioners as outlined above. Such payments will be provided in the <br /> form of a bill credit during the five monthly billing periods of June—October. <br /> Adopted December 11, 2018 <br /> Effective January 1, 2019 <br /> Page 3 of 3 <br /> 91 <br />