My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.3. ERMUSR 09-10-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
09-10-2019
>
2.3. ERMUSR 09-10-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2019 3:06:13 PM
Creation date
9/6/2019 4:15:26 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
9/10/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
For the 50 kW DC Fast Charger, ERMU's goal was to partner with a convenience store property <br /> located on a high traffic corridor. As EVs are becoming more common, the goal of this <br /> installation was to provide a model for partnerships with convenience store owners that <br /> provide fuel for standard internal combustion engines. This would provide traditional <br /> convenience stores the opportunity to learn about EV charging facilities as well as customer <br /> behaviors. <br /> The first convenience store location installation encountered significant delays as a result of a <br /> road redevelopment project and the associated challenges that come with the relocation of <br /> underground utilities in the area. As a result of those redevelopment challenges, ERMU needed <br /> to evaluate other options for the installation of the DC Fast Charger. Across town, the Coborn's <br /> grocery store was in the process of adding a 12-pump fuel station in their parking lot. ERMU <br /> approached Coborn's about the possibility of installing the DC Fast Charger in their parking lot, <br /> adjacent to the new fuel pumps. In a matter of a few weeks, terms were agreed to, and a <br /> license agreement was put in place to allow ERMU to install and operate the DC Fast Charger at <br /> their new fuel station. <br /> The Coborn's site was an excellent option because it was located on major transportation <br /> corridor traveled by more than 50,000 vehicles per day. Located within walking distance are a <br /> grocery store, liquor store, fast food restaurant, deli, and retail shopping. The proximity to the <br /> highway means easy access and high visibility. ERMU partnered with Coborn's to locate the <br /> charging station on their property utilizing a 10-year lease agreement. ERMU did not have to <br /> pay anything for the lease agreement in this partnership. <br /> ERMU installed a third charger in the parking lot shared by the utilities and the City of Elk River. <br /> The primary purpose of this charger is to support ERMU's and the City's EV fleets, but it has <br /> been occasionally used by the public. The location in the Elk River Municipal Utilities/City <br /> parking lot is not ideal, but it is located within walking distance of the public library and city <br /> parks and trails. <br /> The equipment was very easy to install. Once the site was prepared, the installation of the units <br /> only took a couple of hours. Preparing the site and sourcing the electricity are the most <br /> challenging parts. When evaluating sites, the location and the costs associated with getting <br /> power to the site are critical. <br /> Back Office Support for Public Charging Stations <br /> A key factor in selecting ChargePoint was the expertise they provide in installation, setup, <br /> ongoing support, and customer billing. The call center is staffed 24/7 for customers and <br /> equipment owners. As part of the overall package, ERMU decided to purchase the Assure <br /> 21 <br /> 60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.