My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.0.b. SWCSR 08-15-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Sherburne Wright Cable Commission
>
SWC Packets
>
2019
>
08-15-2019
>
5.0.b. SWCSR 08-15-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2019 3:32:09 PM
Creation date
8/22/2019 3:32:09 PM
Metadata
Fields
Template:
City Government
type
SWCSR
date
8/15/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> RSA:961308 <br /> SERVICES TO BE PROVIDED <br /> AVI Systems will provide drawings for customer to install digital video transport into existing system at the City of Buffalo <br /> PRODUCTS AND SERVICES DETAIL <br /> PRODUCTS: <br /> Mfg Description Qty, Price Extended <br /> Buffalo City Hall <br /> CRESTRON 1-to-2 4K HDMI®Distribution Amplifier 1 $182.93 $182.93 <br /> CRESTRON 4x1 4K HDMI®Switcher 2 $426.83 $853.66 <br /> CRESTRON 1:8 HDMI®Distribution Amplifier w/4K60 4:4:4& HDR Support 1 $609.76 $609.76 <br /> CRESTRON 1:4 HDMI®Distribution Amplifier w/4K60 4:4:4& HDR Support 1 $335.37 $335.37 <br /> CRESTRON DM Lite—HDMI®over CATx Transmitter, Surface Mount 5 $201.22 $1,006.10 <br /> CRESTRON DM Lite—HDMI®over CATx Receiver, Surface Mount 5 $201.22 $1,006.10 <br /> HALL RESEARCH HDMI/ DVI to SDI Converter 1 $169.05 $169.05 <br /> LIBERTY AV HDMI PREMIUM 18G CBL W/NET 6' 16 $14.96 $239.36 <br /> LIBERTY AV HDMI PREMIUM 18G CBL W/NET 10' 2 $17.51 $35.02 <br /> LIBERTY AV HDMI PREMIUM 18G CBL W/NET 15' 6 $33.49 $200.94 <br /> LIBERTY AV RJ45 INSERT CAT6A SH 180 10 $6.16 $61.60 <br /> C2G 3FT CAT6A SNAGLESS STP CA 10 $10.69 $106.90 <br /> CRESTRON DigitalMedia 8G Cable, plenum, 500 ft spool 2 $365.85 $731.70 <br /> Sub-Total: Buffalo City Hall $5,538.49 <br /> Drawings <br /> Engineering& Drawings $1,050.60 <br /> Project Management $280.16 <br /> Integrations Cables& Connectors $166.67 <br /> Sub-Total: labor $1,497.43 <br /> Total: $7,035.92 <br /> Refer to Page 1 for the Grand Total that includes Taxes, and Shipping&Handling. <br /> Printed on August 1,2019 Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.