My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.1 ICESR 05-31-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Arena Commission
>
ICE Packets
>
2010-2019
>
2018
>
05-31-2018 SPECIAL
>
3.1 ICESR 05-31-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2019 3:01:01 PM
Creation date
8/22/2019 3:00:48 PM
Metadata
Fields
Template:
City Government
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River Operations Analysis <br />ackg_roand, , .,_ <br />The operations analysis represents a conservative approach to estimating expenses and revenues <br />and was completed based on the best information available and a basic understanding of the <br />project. Fees and charges utilized for this study reflect a philosophy designed to meet a <br />reasonable cost recovery rate and future operations cost and are subject to review, change, and <br />approval by the City. There is no guarantee that the expense and revenue projections outlined in <br />the operations analysis will be met as there are many variables that affect such estimates that <br />either cannot be accurately measured or are subject to change during the actual budgetary <br />process or partnership. <br />Expenditures <br />Expenditures have been formulated on the costs that were designated by staff and Ballard*King <br />and Associates to be included in the operating budget for the facility. The figures are based on <br />the size of the center, the specific components of the facility, and the hours of operation. All <br />expenses were calculated to the high side and the actual cost may be less based on the final <br />design, operational philosophy, and programming considerations adopted by the City. The <br />consulting team was tasked with exploring three different operating models that included a <br />different mix of components. The Community Center includes two sheets of ice, community <br />rooms and community programming. The Multi-purpose option includes two sheets of ice, an <br />indoor turf field, leased space and community room. The Ice Arena option includes a two -sheet <br />ice facility, concession area and upgraded locker room facilities. <br />ategory Comm.Center Multi -Purpose _ ,Ice Arena <br />Personnel <br />Full-time <br />Part-time <br />Total <br />$250,599 <br />$316,493 <br />$567,092 <br />$250,599 <br />$155,520 <br />$406,119 <br />$250,599 <br />$132,284 <br />$382,883 <br />Cate o Comm Center Multi-PuKpose Ice Arena <br />Utilities $228,750 $338,950 $ 210,000 <br />(gas & elect) <br />Telephone $ 3,500 $ 3,950 $ 3,500 <br />
The URL can be used to link to this page
Your browser does not support the video tag.