Laserfiche WebLink
3.2 RESPONSIBILITY <br /> A. The Engineer's review of a submittal shall not relieve the Contractor from the responsibility for deviation <br /> from the drawings and specifications unless the Contractor has, in writing,called the Engineer's attention to <br /> the deviations at the time of submission; nor shall it relieve the Contractor from the responsibility of errors <br /> in the submittals. <br /> B. All submittals shall be reviewed by the Engineer prior to their incorporation into the project. If materials <br /> are installed without prior review,they will be subject to removal,at the Contractor's expense, if the <br /> material is found to be non-conforming to the Specifications. <br /> **** END OF SECTION **** <br /> City of Elk River-R13.119052 SUBMITTALS <br /> August 2019 PAGE 01330-3 <br /> V062612 ©Bolton&Menk,Inc.2019,All Rights Reserved <br />