My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.7. SR 08-19-2019
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2019
>
08-19-2019
>
4.7. SR 08-19-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2019 3:32:57 PM
Creation date
8/15/2019 3:26:13 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/19/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.2 RESPONSIBILITY <br /> A. The Engineer's review of a submittal shall not relieve the Contractor from the responsibility for deviation <br /> from the drawings and specifications unless the Contractor has, in writing,called the Engineer's attention to <br /> the deviations at the time of submission; nor shall it relieve the Contractor from the responsibility of errors <br /> in the submittals. <br /> B. All submittals shall be reviewed by the Engineer prior to their incorporation into the project. If materials <br /> are installed without prior review,they will be subject to removal,at the Contractor's expense, if the <br /> material is found to be non-conforming to the Specifications. <br /> **** END OF SECTION **** <br /> City of Elk River-R13.119052 SUBMITTALS <br /> August 2019 PAGE 01330-3 <br /> V062612 ©Bolton&Menk,Inc.2019,All Rights Reserved <br />
The URL can be used to link to this page
Your browser does not support the video tag.