Laserfiche WebLink
Important Aspects Forthcoming: Project Design Refinement and Permitting Excavation to occur during winter/frozen conditionsEngineers)US Clean Water Act Authorization (US Army Corps <br /> of down timing, Aquatic Plant Management-DNR Public Waters Work Permit, Blanding’s Turtle, Lake Drawtraffic access (US Highway 10)MnDOTSHPO Phase 1A archaeological studyComments <br /> were received during the comment period: <br />