Laserfiche WebLink
13C Legg Truss Bleachers Seating and Athletic Facility $125,797.00 <br /> Enterprise <br /> 14A Hydraulic Passenger Thyssenkrupp Elevator $79,500.00 <br /> Elevator Corp. <br /> 21A Fire Suppression Summit Companies $256,485.00 <br /> System <br /> 22A Plumbing Systems Weidner Plumbing and $1,206,000.00 <br /> Heating <br /> 23A HVAC Systems Sentra-Sota Sheet Metal $1,776,000.00 <br /> Inc <br /> 26A Electrical Design Electric $1,786,914.00 <br /> 31A Earthwork IA MN Utilities & Excavating $572,787.00 <br /> 31B Earthwork Lion Park U.S. SiteWork $502,200.00 <br /> 32A Asphalt Paving Bituminous Roadways $324,100.00 <br /> 32B Concrete Ebert, Inc $387,400.00 <br /> Sidewalk/Curb/Gutter <br /> 32C Landscaping IA Greenscape Companies $39,800.00 <br /> 32D Landscaping Lion Park Greenscape Companies $96,500.00 <br /> 32E Chain Link Fences Foundation Service Corp $94,000.00 <br /> 33A Utilities Metro Utilities $586,000.00 <br /> NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk <br /> River,Minnesota, as follows: <br /> 1. The prime contracts to the recommended low bidders are hereby awarded except <br /> for Category 6A Carpentry. <br /> 2. Alternate 3 —Prep and Paint Field House, and Alternate 8-Exterior Lighting at <br /> Softball Field 1 are hereby selected and their costs have been included in the bid <br /> numbers detailed above. <br /> 3. The assignment of the prime contracts to RJM Construction is hereby NATUREJ <br />