My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. BASR 06-25-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Board of Adjustments
>
BOA Packets
>
2010-2019
>
2019
>
06-25-2019
>
5.2. BASR 06-25-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2019 9:03:48 AM
Creation date
6/20/2019 12:37:31 PM
Metadata
Fields
Template:
City Government
type
BASR
date
6/25/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5,2 �- 5.3 <br />H�ndalt- <br />EDA <br />slid <br />Memorandum <br />To: planning Department <br />From: MN Department of Natural Resources <br />Date: 06-20-2019 <br />Subject: Variance Request for Comments — June 2019 <br />The agency listed above has reviewed the application listed below and has the following comments: <br />V 19-03 Valentine & Michelle Mattsen-Kraljic —17863 Concord St. NW — 30' <br />bluff setback variance for the Wild & Scenic River Setback to allow <br />installation of a deck <br />1. Allowing structures to be placed closer than the minimum 30 foot setback can lead to <br />destabilization of the bluff which will lead to structural failure and failure of the bluff. <br />There are no mitigation practices that can be recommended at this time to offset the <br />impact. <br />V 19-05 Brian Copeland —18378 Boston St NW - lot coverage variance <br />1. Mitigation of the site should be performed to offset the impacts from increasing <br />impervious surface area. This mitigation can be in the form of rain gardens or other <br />approved water retention features. <br />
The URL can be used to link to this page
Your browser does not support the video tag.