My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2. SR 06-17-2019
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2019
>
06-17-2019
>
8.2. SR 06-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2019 9:44:28 AM
Creation date
6/13/2019 11:35:46 AM
Metadata
Fields
Template:
City Government
type
CCM
date
6/17/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Minutes <br />May 17, 1993 <br />------------- <br />Page 11 <br />. A. TERRY MAURER'S COMMENTS ARE INCORPORATED IN THE DESIGN OF THE <br />ROAD AND THAT MR. MAURER REVIEWS AND APPROVES THE DESIGN OF <br />THE STREETS AND, PRIOR TO RECORDING THE PLAT, INSPECTS THEM. <br />B. THE ROAD IN THIS PLAT IS NAMED VICTORIA DRIVE. <br />C. A CONSTRUCTION PERMIT IS OBTAINED FROM THE COUNTY ENGINEERING <br />DEPARTMENT TO HAVE 205TH AVENUE CONNECT TO MEADOWVALE ROAD. <br />D. THE CITY ATTORNEY VERIFY THE LEGITIMACY OF THE EASEMENT FROM <br />MRS. COATES TO THE CITY. <br />2. MR. MAURER'S COMMENTS REGARDING DRAINAGE ARE INCORPORATED IN THE <br />DESIGN OF THE STORM SEWER FOR THIS PLAT. THE DESIGN MUST BE <br />APPROVED BY MR. MAURER. THE DEVELOPER MUST PROVIDE DRAINAGE <br />CALCULATIONS TO SHOW THAT THE EASEMENT IN THE PLAT IS ADEQUATE IN <br />SIZE. <br />3. THE TREES REMOVED DURING CONSTRUCTION OF ROADS AND HOUSES HAVE <br />THEIR STUMPS REMOVED WITHIN 24 HOURS OR HAVE THEIR ROOTS SEVERED <br />FROM ADJACENT TREES PRIOR TO REMOVAL. ROOT SEVERING MUST BE DONE <br />TO THE DEPTH OF 5 FEET. FURTHER, EXPOSED ROOTS MUST BE BURIED THE <br />SAME DAY AS REMOVAL. THE DRIP LINE OF TREES REMAINING AFTER <br />CONSTRUCTION MUST BE ROPED OFF TO DEFINE AN AREA OF NO ACTIVITY TO <br />PROTECT THE TREES FROM MECHANICAL DAMAGE. <br />4. PARK DEDICATION IS $2,800 FOR SEVEN NEWLY CREATED LOTS. <br />5. THAT THE PUBLIC IMPROVEMENTS ARE SECURED BY A 100% LETTER OF <br />CREDIT PRIOR TO RECORDING THE PLAT (OR WHATEVER PERCENTAGE IS CITY <br />POLICY) PLUS A WARRANTY BOND IN THE AMOUNT OF 25% OF THE COST OF <br />THE PUBLIC IMPROVEMENTS IS PROVIDED TO THE CITY FOR A 1 YEAR <br />PERIOD AFTER CITY ACCEPTANCE OF THE PUBLIC IMPROVEMENTS. <br />6. THE IMPROVEMENTS IN THIS PLAT HAVE A COMPLETION DATE OF ONE YEAR <br />FROM THE DATE OF FINAL PLAT APPROVAL. <br />7. A DEVELOPERS AGREEMENT IS ENTERED INTO REFLECTING THE STIPULATIONS <br />OF APPROVAL. <br />8. THE DEVELOPER MUST REIMBURSE THE CITY FOR THE COST OF REVIEWING <br />THE PLAT. <br />9. THE TEMPORARY CUL-DE-SAC IS EXTENDED TO THE NORTH END OF LOT 4, <br />AND IS MADE FULL SIZE. THAT PORTION THAT FALLS OUTSIDE OF THE 60 <br />FOOT RIGHT -OF --WAY MUST BE SECURED BY TEMPORARY EASEMENTS THAT ARE <br />AUTOMATICALLY RELEASED WHEN THE ROAD IS EXTENDED. <br />10. THE COST OF THE FIRST SEAL COATING (AS ESTIMATED BY THE CITY <br />ENGINEER) IS PAID BY THE DEVELOPER PRIOR TO RECORDING FINAL PLAT. <br />11. THAT THE DRAINAGE AND UTILITY EASEMENTS THAT EXTEND NORTH AND EAST <br />FROM THE RIGHT-OF-WAY IN THE PLAT, ALSO BE DEDICATED THROUGH <br />• EASEMENT DOCUMENTS TO THE CITY FOR ROADWAY PURPOSES. <br />COUNCILMEMBER HOLMGREN SECONDED THE MOTION. THE MOTION CARRIED 5-0. <br />
The URL can be used to link to this page
Your browser does not support the video tag.