Laserfiche WebLink
Evans Park, Inc. DBA <br />Guardian Angels by the Lake (GABTL) <br />Description of project narrative for two stall garage <br />Given the increased need for transportation services for the seniors we serve and <br />in an effort to keep our buses in good condition, we find it valuable and necessary <br />to build a two stall garage for the two 2 HC accessible busses we currently own <br />and operate. <br />Bus services usually run from 7:30 AM -4:00 PM M -F with other occasional hours <br />to accommodate special needs or events such as Christmas light tours, an <br />occasional Saturday picnics, etc. <br />Our bus service is primarily run by one lead DOT certified driver and may be <br />supplemented with other DOT certified drivers as needed. <br />The proposed 30 X 30 garage will be built on a floating slab on grade, wood <br />framed, vinyl siding (same as GABTL siding). The height to the base of the roof line <br />will be —16 feet to accommodate 14' high garage doors the height of the busses <br />(min 10' clearance). <br />The proposed garage will be located in a remote part of the current parking lot, <br />partially nestled into a current berm (Please see attached picture). The current <br />GABTL building will serve as a backdrop for this garage which will be built of <br />similar materials used at GABTL so as to blend in with the community. <br />The current placement of this garage on our current parking lot will diminish our <br />current parking spaces by three, which are not used except when we have our <br />summer family picnic each year. <br />There is no proposed screening, outdoor storage or signage with this plan. <br />Landscaping around the building will consist of leveled, seeded turf, cut and <br />maintained as per or regular lawn maintenance protocol. <br />We are proposing to draw electric off of the electric supply across the street as <br />noted on the utility plan. <br />